Laserfiche WebLink
REQUEST FOR CITY COUNCIL AGENDA ITEMREQUEST FOR CITY COUNCIL AGENDA ITEM <br />April 16, 2016April 16, 2016AppropriationAppropriation <br />Agenda Date Requested:Agenda Date Requested: <br />Source of Funds:Source of Funds: <br />Sharon ValianteSharon Valiante <br />Requested By:Requested By: <br />Account Number:Account Number: <br />Public WorksPublic Works <br />Department:Department: <br />Amount Budgeted:Amount Budgeted: <br />Report:Resolution:Resolution:Ordinance:Ordinance: <br />Amount Requested:Amount Requested: <br />Other: <br />Budgeted Item:Budgeted Item:YESYESNONO <br />AttachmentsAttachments : : <br />1. Copy FY 16 Updated CIP Budget Copy FY 16 Updated CIP Budget <br />2. Project Description Prelim Cost Lomax Project Description Prelim Cost Lomax <br />3. Amendment to TxDot Agreement Amendment to TxDot Agreement -- Airport Airport <br />4. TxDOT Updated Aviation Project TxDOT Updated Aviation Project <br />DevelopmentDevelopment <br />5. Preliminary 5 Year CIP BUdgets (FY 17 Preliminary 5 Year CIP BUdgets (FY 17--21)21) <br />SUMMARY & RECOMMENDATIONSSUMMARY & RECOMMENDATIONS <br />The FY 16 plan is being implemented and updated.  The proposed draft of the next 5The FY 16 plan is being implemented and updated.  The proposed draft of the next 5--year CIP year CIP <br /> <br />preliminary plan is included for reference and will require adjustment over time by City Council as preliminary plan is included for reference and will require adjustment over time by <br /> City Council as <br />changing priorities and conditions dictate.   The 5changing priorities and conditions dictate.   The 5--YR CIP includes streets and drainage within the road YR CIP includes streets and <br /> drainage within the road <br />right-of-way areas, along with City utility and airport projects. way areas, along with City utility and airport projects.  <br />The FY 2016 plan assumptions are as follows: $5.1 M in projects approvedThe FY 2016 plan assumptions are as follows: $5.1 M in projects approved <br />Sources of funding include $1,000,000/year street tax, $250,000/year from the drainage fee, Sources of funding include $1,000,000/year street tax, $250,000/year from the drainage fee, <br /> <br />$150,000 from the General Fund previously (and still) going toward sidewalk repairs, and $150,000 from the General Fund previously (and still) going toward sidewalk repairs, and $150,000 <br /> from the General Fund previously (and still) going toward sidewalk repairs, and $150,000 from the General Fund previously (and still) going toward sidewalk repairs, and <br />$2,000,000 from bond proceeds. $2,000,000 from bond proceeds.  <br />$2,000,000/year for utility improvements.  Including $2,000,000 from bond proceeds. $2,000,000/year for utility improvements.  Including $2,000,000 from bond proceeds.  <br />Updates/Notable Changes to the FY 2016 plan:Updates/Notable Changes to the FY 2016 plan: <br />In March 2015, staff submitted a project package for the Lomax Lift Station Consolidation Project In March 2015, staff submitted a project package for the Lomax Lift Station Consolidation <br /> Project <br />to the Texas Water Development Board (TWDB) for consideration of funding.  City staff are to the Texas Water Development Board (TWDB) for consideration of funding.  City staff are <br />currently completing an application for a loan application for $10.6 M.   This loan amount may be currently completing an application for a loan application for $10.6 M.   This loan <br /> amount may be <br />reduced by more than $1reduced by more than $1--million depending on TWDBmillion depending on TWDB’’s review of the Citys review of the City’’s green project s green project <br />request. request.  <br />The Water Meter Replacement Project is working well with a $90,000 budget.The Water Meter Replacement Project is working well with a $90,000 budget. <br />TxDOT and the City have now entered into an agreement to perform a Business Plan study.  It is TxDOT and the City have now entered into an agreement to perform a Business Plan study.  <br /> It is <br />just now kicking off with a SWOT analysis scheduled for late April 2016.  The Cityjust now kicking off with a SWOT analysis scheduled for late April 2016.  The City’’s share is now s <br /> share is now <br />at $11,327 (10%).  Total project cost is $113,270.at $11,327 (10%).  Total project cost is $113,270. <br />Future/Other Considerations:Future/Other Considerations: <br />City and Harris County staff have discussed the need for future improvements to Fairmont City and Harris County staff have discussed the need for future improvements to Fairmont <br /> <br />