1LS$31,500.00$31,500.00$12,000.00$12,000.00$10,000.00$10,000.00$41,000.00$41,000.00$38,125.00$38,125.00$70,000.00$70,000.005480Ton$77.00$421,960.00$83.28$456,374.40$93.50$512,380.00$87.00$476,760.00$
<br />109.00$597,320.00$110.00$602,800.0047544SY$0.90$42,789.60$1.85$87,956.40$1.50$71,316.00$1.75$83,202.00$2.69$127,893.36$3.00$142,632.001191SY$7.00$8,337.00$6.86$8,170.26$6.00$7,146.00$13.00$15,483.00$
<br />10.00$11,910.00$15.00$17,865.001340SY$9.50$12,730.00$6.93$9,286.20$6.50$8,710.00$5.50$7,370.00$10.00$13,400.00$15.00$20,100.0075Ton$147.00$11,025.00$150.00$11,250.00$200.00$15,000.00$163.00$12,225.00
<br />$187.50$14,062.50$250.00$18,750.001LS$5,000.00$5,000.00$20,000.00$20,000.00$10,000.00$10,000.00$3,500.00$3,500.00$51,062.50$51,062.50$29,500.00$29,500.00357Ton$66.00$23,562.00$78.13$27,892.41$54.00$1
<br />9,278.00$93.00$33,201.00$65.00$23,205.00$50.00$17,850.00750SY$9.50$7,125.00$5.55$4,162.50$10.00$7,500.00$1.00$750.00$45.54$34,155.00$22.00$16,500.00250Ton$83.00$20,750.00$85.00$21,250.00$97.00$24,250
<br />.00$93.00$23,250.00$126.25$31,562.50$115.00$28,750.00
<br />$658,342.17$685,580.00$696,741.00$942,695.86$964,747.00
<br />PriceExtended
<br />Greene
<br />Construction
<br />Durwood
<br />PriceExtendedUnit
<br />and
<br />Contracting
<br />Trucking
<br />TLC
<br />PriceExtendedUnit
<br />Brothers
<br />Angel
<br />PriceExtendedUnit
<br />OVERLAY
<br />Paving
<br />Asphalt
<br />STREET
<br />TABULATION
<br />AAA
<br />PriceExtendedUnit
<br />2016
<br />FY
<br />Paving
<br />PORTE
<br />Hayden
<br />BID
<br />PriceExtendedUnit
<br />LA
<br />16014
<br />$584,778.60
<br />Construction
<br />BID
<br />Forde
<br />Unit
<br />Measure
<br />BID
<br />of
<br />Unit
<br />BASE
<br />Estimated
<br />Quantity
<br />TOTAL
<br />Subgrade
<br />6"
<br />2016
<br />MillingMilling
<br />(as
<br />Base
<br />Course
<br />26,
<br />SubgradeSubgradeConcreteand
<br />Asphalt
<br />Subgrade
<br />Pavement
<br />April
<br />Base
<br />directed)
<br />Crushed
<br />andand
<br />D
<br />Asphalt
<br />Items
<br />Opening:
<br />Stablilized
<br />Type
<br />Control
<br />PavementPavement
<br />Mobilization
<br />Proposed
<br />RemovalRemoval
<br />HMAC,
<br />(as
<br />Recycled
<br />Bid
<br />8%A
<br />Thickness
<br />directed)
<br />Removal
<br />Traffic
<br />Type
<br />LimeLime
<br />Base
<br />2"2"8"6"
<br />Bid
<br />andand10.
<br />1.2.3.4.5.6.7.8.9.
<br />
<br />
|