Laserfiche WebLink
REQUEST FOR CITY COUNCIL AGENDA ITEM <br />Budget <br />Agenda Date Requested: May 23, 2016 <br /> <br />Source of Funds: 003,019, 051 <br />Requested By: Sharon Valiante <br />003-9892-531-1100 <br />019-9892-531-1100 <br />Department: Public Works <br />Account Number: 051-7071-531-1100 <br />100,000 <br />Report: ___ Resolution: _____ Ordinance: _________ <br />200,000 <br />Amount Budgeted:650,000 <br /> <br />100,000 <br />th <br />Exhibit D St & 4 Project Location Map <br />182,043 <br />Amount Requested: 650,000 <br />Exhibit: Bid Recommendation &Bid Tabulation <br />Total:932,043 <br />Budgeted Item:YESNO <br />Exhibit: Tolunay-Wong Proposal for Materials Testing <br /> <br />SUMMARY & RECOMMENDATION <br />City Council authorized a design services contract with Cobb Fendley in the amount of $75,585 <br />th <br />on November 10, 2014 for the design of the D Street and 4 Street Paving and Drainage <br />improvements (the City used a RFQ process to select Cobb Fendley). Staff provided Council <br />with a construction estimate equal to $950,000 with the 2014 design services agenda request. <br />$932,043. <br />th <br />Bid #16012 for the D Street & 4 Street Paving and Drainage Improvements was opened and <br />read on April 12, 2016. The bid was advertised in the Bay Area Observer on March 24 & April <br />7Thirty-two vendors accessed the bid, and 4 <br />bids were received. G. W. Phillips Concrete Construction submitted the lowest and best total bid <br />at $874,149.50, which includes the base bid ($858,714.50) Extra Work ($1,860) and Alternate <br />Bid Items ($13,575). <br />The Extra Work Items are typical construction materials (cement stabilized sand and reinforced <br />- <br />Alternate Bid Items will address where needed the following: Where there are trees or bushes in <br />or at the edge of the right of way conflicting with sidewalk constructionill be <br />consulted as the project progresses, and a sound and reasonable decision will be made in <br />reference to removal, relocating, replacing and in some cases routing the sidewalk around the <br />existing tree or bush with crushed granite pavingStaff believe the tree/bush alternate is the best <br />quality <br />the contractor for a one year period. <br />rd <br />The design and construction of this project is similar in nature to the reconstruction of 3 Street <br />in 2014. <br />Contingency: Staff is requesting a $43,708 contingency equal to 5.0%. <br /> <br />