BIDTABULATION
<br />BID16019FAIRMONTPARKINGLOT
<br />AztecRemodelingandTaylorandTaylor
<br />LandscapingConstructionFordeConstruction
<br />BidOpening:July19,2016
<br />EstimatedUnitof
<br />BaseBidItems QuantityMeasure
<br />UnitPriceExtendedUnitPriceExtendedUnitPriceExtended
<br />1.Mobilization
<br />1LS$10,000.00$10,000.00$1,500.00$1,500.00$44,500.00$44,500.00
<br />2.RemoveandDisposeofAsphaltSurfacew/
<br />Base11"Depth
<br />2520SY$16.00$40,320.00$12.15$30,618.00$17.00$42,840.00
<br />3.LimeStabilization6"Depth
<br />2070SY$1.78$3,684.60$8.83$18,278.10$13.00$26,910.00
<br />4.Lime
<br />60Ton$175.00$10,500.00$150.00$9,000.00$184.00$11,040.00
<br />5.8"RecycledCrushedConcreteBase
<br />965Ton$36.00$34,740.00$63.00$60,795.00$75.00$72,375.00
<br />6.3"HMAC,TypeDAsphalt
<br />385Ton$95.00$36,575.00$266.00$102,410.00$110.00$42,350.00
<br />7.ConcreteSidewalk4.5"Depth
<br />80SF$7.00$560.00$30.00$2,400.00$54.00$4,320.00
<br />8.ThermoplasticPavementMarkings
<br />1LS$1,500.00$1,500.00$3,590.90$3,590.90$1,300.00$1,300.00
<br />9.Signage,Completeinplace
<br />1LS$500.00$500.00$1,060.00$1,060.00$475.00$475.00
<br />10.Moveandresetcurbstops
<br />56EA$25.00$1,400.00$35.00$1,960.00$38.00$2,128.00
<br />11.Newcurbstops56
<br />EA$50.00$2,800.00$85.00$4,760.00$70.00$3,920.00
<br />12.Sodding
<br />250
<br />SY$4.00$1,000.00$12.00$3,000.00$7.00$1,750.00
<br />13.SiltFenceProtection,asneeded1
<br />LS$500.00$500$2,600.00$2,600.00$1,000.00$1,000.00
<br />TOTALBASEBID$144,079.60$241,972.00$254,908.00
<br />
<br />
|