My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
10-24-16 Regular Meeting of the La Porte City Council
LaPorte
>
Agendas
>
.AGENDAS
>
Open Meetings
>
City Council
>
City Council
>
City Council Meetings
>
2016
>
10-24-16 Regular Meeting of the La Porte City Council
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/19/2016 4:44:13 PM
Creation date
11/21/2024 8:10:12 AM
Metadata
Fields
Template:
La Porte TX
Document Type
Agenda PACKETS
Date
10/24/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
89
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
(b) all future Response Costs of the USOR Site PRP Group arising from Future Orders at the <br />USOR Site; and <br />(c) third- <br />of the Removal Action AOC, AOI-1 RI/FS AOC or any Future Orders conducted at the USOR Site. <br />(d) claims by any USOR Site PRP Group member, including but not limited to Effective <br />Environmental, Inc. against City of La Porte for contractual indemnity, breach of contract, and/or breach of <br />warranty. <br />1.3.2 Covered Matters shall not mean: <br />(a) any claim or liability relating to the enforcement of this Settlement Agreement; <br />(b) claims for toxic torts, personal injury or property damage claims by third-party entities <br />who are not Settling Parties; <br />(c) criminal liability; <br />(d) liability of the Settling Parties based upon their ownership or operation of the USOR Site, <br />or upon the transportation, treatment, storage, or disposal, or the arrangement for the transportation, treatment, <br />storage, or disposal, of a hazardous substance or a solid waste at or in connection with the USOR Site, after <br />signature of this Settlement Agreement; <br />(e) liability for claims of any nature related to any facility other than the USOR Site; <br />(f) any claims resulting from City of La Porteviolation of any order issued pursuant to <br />CERCLA or the TSWDA, other than any Future Orders; and <br />(g) claims by any third party, other than USOR Site PRP Group members and Settling <br />Parties, against City of La Porte for contractual indemnity or related to City of La Porteactual or alleged <br />insurers. <br />1.4 EPA shall mean the United States Environmental Protection Agency. <br />1.5 Future Orders shall mean an order of EPA or any other federal or state agency that <br />requires any response actions to the extent such response actions address any hazardous substances or other <br />pollutants discharged or disposed of at the USOR Site prior to the date of the Removal Action AOC. <br />1.6 Removal Action AOC <br />-10-11. <br />1.7 Response Costs shall mean removal and remedial response costs; costs of operation, <br />maintenance and monitoring of any removal or remedial action; oversight costs; and any other costs of <br />complying with the Removal Action AOC, AOI-1 RI/FS AOC or any Future Orders. <br />2 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.