My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
04-22-19 Regular Meeting of the La Porte City Council
LaPorte
>
Agendas
>
.AGENDAS
>
Open Meetings
>
City Council
>
City Council
>
City Council Meetings
>
2019
>
04-22-19 Regular Meeting of the La Porte City Council
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2025 12:17:49 PM
Creation date
11/21/2024 8:12:35 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Agenda Packet
Date
4/22/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
City ofLaPorte <br />8ecbonOO41O <br />Sid Form <br />[ATE: 3-19-19 <br />Bid of W.W' Payton Corporation an acorporation organized and existing <br />under laws nfthe State cfTexas, for the HiUhdge <br />Water Plant Improvements Phase 11, for the City of La Porte, Harris County, Texas. <br />The undersigned bidder has carefully examined the Instructions to Bidders, this Proposal, the General <br />Conditions of Agreement, the Technical Specifications and the drawings for the work herein above <br />described and referred to in the Invitation to Bid and has carefully examined the site of the work and will <br />provide all necessary |abor, eupehntendence, machinery, equipment, ton|o, mederie!n, services and other <br />means of construction to complete all the work upon which he bido, as called for in the Contract, the <br />Specifications and shown nnthe drawings, and in the manner prescribed therein and according to the <br />requirements nfthe City of La Porte. <br />Total ofItem &B&C <br />� <br />TOTAL BASE BID <br />/ <br />c� <br />It is understood and agreed that the work shall be complete in full within 350 calendar days after the date <br />on which work is to be commenced as established by the Contract Documents. <br />kiaagreed that the contract price may be increased or decreased to cover work added mdeleted by order <br />of the Engineer, in accordance with the provisions of the General Conditions of Agreement. <br />The undersigned agrees that the amounts bid in this proposal will not be withdrawn or modified for sixty <br />(60) days following date of bid opening. <br />It is understood that the bid security accompanying this proposal shall be returned to the undersigned <br />un|eoa, in case of the acceptance of this proposal the undersigned should fail to enter into a construction <br />contract and execute bonds aeprovided inthe specifications. |nthe event the undersigned should fail ho <br />enter into a construction contract and execute bonds as required within 14 calendar days after the Engineer <br />has given unsigned contracts tothe Contnaotor, it is understood and agreed that the bid security shall be <br />forfeited to the Owner and shall be considered as payment for damages duo to delay and other <br />inconveniences suffered by the Owner as a result of such failure on the part of the undersigned. <br />
The URL can be used to link to this page
Your browser does not support the video tag.