My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
07-08-19 Regular Meeting of the La Porte City Council
LaPorte
>
Agendas
>
.AGENDAS
>
Open Meetings
>
City Council
>
City Council
>
City Council Meetings
>
2019
>
07-08-19 Regular Meeting of the La Porte City Council
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2025 12:37:58 PM
Creation date
11/21/2024 8:12:39 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Agenda Packet
Date
7/8/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Lockwood, Andrews <br />& Newnarn, Inc. <br />an� A LEO n raM Y COMPANY <br />May 24, 2019 <br />City of La Porte <br />2693 N 231d Street <br />La Porte, TX 77571 <br />Attention: Lorenzo Wingate, PE, CFM <br />Re: Northside Neighborhood Drainage Improvement Project - Preliminary Engineering <br />Report <br />Dear Mr. Wingate, <br />Per your request, Lockwood, Andrews & Newnam, Inc. has prepared a general scope and fee <br />schedule for the Northside Neighborhood Drainage Improvement Project Preliminary <br />Engineering Report. The effort described in Exhibit A will include the proposed scope of <br />services to complete the overall analysis for the area. In general, the tasks include an analysis, <br />improvement evaluation, and construction cost estimates. <br />The goal of the Northside Neighborhood Drainage Improvement Project is to improve the <br />functionality of the stormwater system and increase the storm water level of service in the <br />region. Based on previous studies, this project will revise and implement proposed <br />improvements to the area and reduce the overall flood risk. This effort is focused on developing <br />a regional improvement plan. <br />We propose to complete the total contract for an amount of $59,530.00. Exhibit B provides a <br />detailed man hour estimate of the fees associated with the basic services tasks. This project will <br />be utilizing grants award to the City as part of the 2015 Floods CDBG-DR Allocation. It is <br />anticipated that the preliminary engineering report can be completed within five months of <br />notice -to -proceed. <br />We are prepared to begin this task immediately and look forward to supporting the City of La <br />Porte on this important project. Please feel free to contact me at 713-821-0366 or by email at <br />mjmanges@Ian-inc.com if you have any additional questions. <br />Sincerely, <br />Matt Manges, P.E., CFM <br />Practice Leader, Stormwater <br />Attachments: <br />Exhibit A — Scope of Services <br />Exhibit B — Fee Schedule <br />2925 Briarpark Drive • Houston, Texas 77042-3720 • 713.266.6900 • Fax 713.266.2089 • vww tan-inc.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.