My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
12-09-19 Regular Meeting of the La Porte City Council
LaPorte
>
Agendas
>
.AGENDAS
>
Open Meetings
>
City Council
>
City Council
>
City Council Meetings
>
2019
>
12-09-19 Regular Meeting of the La Porte City Council
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/9/2019 1:44:03 PM
Creation date
11/21/2024 8:12:59 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Agenda Packet
Date
12/9/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />REQUEST FOR CITY COUNCIL AGENDA ITEM <br />Appropriation <br />Agenda Date Requested: December 9, 2019 <br /> <br />Source of Funds: N/A <br />Requested By: Corby D. Alexander, City Mgr. <br /> <br />Department: Administration <br />Account Number: N/A <br /> <br />Amount Budgeted: N/A <br />Report Resolution Ordinance <br /> <br /> <br /> <br />Amount Requested: N/A <br />Exhibits: Pipeline Easement Agreements, appraisal, <br />Budgeted Item: Yes No <br /> <br /> and Area Map <br /> <br /> <br />SUMMARY <br />HSC Pipeline Partnership, LLC has ap <br />easement and springing temporary workspace easement for construction of an <br />ethylene pipeline. The proposed pipeline easement will be located within two existing <br />CenterPoint Energy (formerly Houston Lighting & Power Company) electrical <br />transmission line easements and parallel multiple existing pipeline easements. The <br />subject property is located between the Union Pacific Railroad right-of-way and the <br />City- <br />owned tracts measuring 8.072 acres and 18.378 acres, respectively. The subject <br />rd <br />property is located on the southeast corner of N. C Street and N. 23 Street and <br />measures a total of 26.45 acres (see Area Map). <br />The proposed acquisition has a centerline length of 1,075.51 feet and a width of 16 <br />inches, and contains a total of 0.034 acre (1,486 sf) of land. The temporary workspace <br />is adjacent to the east and west sides of the permanent easement, has a width of <br />approximately 70 feet on the east side and 30 feet on the west side, and contains a <br />total of 1.76 acres of land (76,666 sf) according to the survey exhibit. The area of extra <br />temporary workspace contains 0.12 acres (5,227 sf). Additionally, a temporary access <br />road is needed, and has a width of 15 feet and a length of 1,075.67 feet, and contains <br />16,135 sf. <br />The company has provided an appraisal report and offered the City a total <br />compensation of $65,147 for the subject easement. The compensation amount is <br />based on the before and after technique. In this technique, total compensation due to <br />the owner arises from two sources: the actual compensation (both land and <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.