My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
07-26-21 Regular meeting of La Porte City Council - CC attendance policy
LaPorte
>
Agendas
>
.AGENDAS
>
Open Meetings
>
City Council
>
City Council
>
City Council Meetings
>
2021
>
07-26-21 Regular meeting of La Porte City Council - CC attendance policy
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/15/2022 1:42:43 AM
Creation date
11/21/2024 8:14:23 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
City Council
Meeting Doc Type
Agenda Packet
Date
7/26/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
150
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
(F216-00-00),will be constructed on H Street,just west of 8th Street. New storm sewer <br />system will be placed along 8th Street from G Street to H Street and G and H Streets, <br />th <br />from 8th to 7 Streets. <br /> <br />There were mathematical errors in the bid form that were corrected by the engineer <br />and confirmed by the bidder. The corrected total amount bid for construction was <br />$4,811,589.50. The estimated cost of materials testing will be near $30,000.00, leaving <br />a tight construction budget. Staff requests to utilize $100,000 from drainage <br />contingency to supplement the project, if needed. Staff believes that by utilizing unit <br />prices, it is possible for the project to come in under budget. Therefore, staff <br />recommends awarding Bid #21011 to D&W Contractors, Inc. Staff conducted reference <br />checks on the vendor, which resulted in favorable recommendations. Also, this <br />contractor has performed work within the City (Farrington Boulevard) in the past with <br />excellent results. position was found to be sufficient to support <br />the project requirements. <br /> <br />Benefits: <br /> This project provides for improved drainage capacity for the area. <br /> The project will provide enhancement of the neighborhood with enclosed <br />th <br />drainage, concrete paving, and sidewalks on both sides of 7 Street. <br /> <br />Liabilities: <br /> Delaying the project would likely mean increased future construction costs. <br /> Drainage would not be improved to the same extent. <br /> <br /> <br />ACTION REQUIRED BY CITY COUNCIL <br />th <br />Award Bid #21011, 7 Street Paving and Drainage Improvements, to D&W <br />Contractors Inc. and authorize the City Manager to execute a construction <br />contract for $4,811,589.50 with material testing cost of $30,000.00 and project <br />contingency of $188,862.00 utilizing $100,000.00 from drainage contingency <br />account budget, as needed, for a total authorization of $5,030,452.00. <br />Approved for the City Council meeting agenda <br /> <br />Corby D. Alexander, City Manager Date <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.