Laserfiche WebLink
0 ¦¤ Α ®¥ Α <br /> <br />12. ITC shall notify the director at least 48 hours prior to performing any scheduled repairs or <br />maintenance on the pipeline. For unscheduled emergency repairs or maintenance, taken to <br />protect the public health, safety or welfare, the permittee shall notify the city police department <br />dispatcher as soon as practical but no later than one hour after commencing repairs or <br />maintenance. <br /> <br />Valves will be located inside the Celanese Bayport facility and at the terminus of the line inside the ITC tank <br />farm and the locations are shown on the enclosed vicinity map. <br /> <br />Construction is anticipated for February or March, 2022 and expected to take approximately 6 months. This <br />date is dependent on receiving all our authorizations prior to construction so the date is subject to change. <br />Various construction methods will be utilized, these include HDDs, bores and conventional open cut methods <br />as indicated on the enclosed engineering plans. <br /> <br />ITC appreciates this opportunity to present its proposal to the City. We are available to answer any questions <br />that might arise, and if any additional submittal materials are required, please feel free to contact me using the <br />information below. <br /> <br />I am, Sincerely Yours, <br /> <br /> <br /> <br />Teri Perron <br />Project ROW Lead with Wood. <br />832.799.9007 <br />Teri.perron@woodplc.com <br /> <br />