My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
07-09-18 Drainage and Flooding Committee Meeting
LaPorte
>
Agendas
>
.AGENDAS
>
Open Meetings
>
Drainage and Flooding Committee
>
Drainage Committee
>
2018
>
07-09-18 Drainage and Flooding Committee Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2025 3:01:16 PM
Creation date
11/21/2024 8:15:59 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
Drainage and Flooding Committee
Meeting Doc Type
Agenda Packet
Date
7/9/2018
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
229
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REQUEST FOR DRAINAGE COMMITTEE AGENDA ITEM <br />Agenda Date Requested: July 9, 2018 <br />Requested By: Lorenzo Wingate <br />Department: Public Works <br />Report: w " Resolution: (D Ordinance:( <br />Exhibits: <br />Appropriation <br />Source of Funds: <br />Account Number: <br />Amount Budgeted: <br />Amount Requested: <br />Budgeted Item: y " YES NO <br />SUMMARY <br />Klotz Associates, Inc. provided a report in 2011 analyzing flooding in the Battleground Estates, which indicated <br />that flows within segments of the 1`101 Channel, north of N `P' Street, rise to a level creating capacity <br />limitations which produce frequent out of banks occurrences. The unimproved upstream channel flows into two <br />forty-two inch (42") corrugated metal pipes (CMP), which feed into the improved two 8' x 10' reinforced <br />concrete boxes downstream. LJA Engineering, Inc. provided Engineering Design Services for the recommended <br />improvements of removing the two upstream forty-two inch (42") corrugated metal pipes and extending the dual <br />8' x 10' reinforced concrete boxes across N `P' Street. An Inter -local Agreement with Harris County allows <br />the City to become entitled to a total maximum compensation of $85,000.00, from Harris County, for the <br />construction of drainage improvements across the N `P' Street right-of-way, intersecting the HCFCD Channel <br />Unit 1`101-06. Construction is expected to be completed by September 3, 2018. <br />Action Re quire d: <br />Approved for Drainage Committee Agenda <br />Corby D. Alexander, City Manager Date <br />
The URL can be used to link to this page
Your browser does not support the video tag.