My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
05-22-17 Meeting of the La Porte Development Corporation Board
LaPorte
>
Agendas
>
.AGENDAS
>
Open Meetings
>
La Porte Development Corporation/4B
>
2017
>
05-22-17 Meeting of the La Porte Development Corporation Board
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2017 10:49:22 AM
Creation date
11/21/2024 8:18:25 AM
Metadata
Fields
Template:
City Meetings
Meeting Body
La Porte Development Board Corporation/Type B
Meeting Doc Type
Agenda Packet
Date
5/22/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REQUEST FOR LA PORTE DEVELOPMENT CORPORATION AGENDA REQUEST FOR LA PORTE DEVELOPMENT CORPORATION AGENDA <br />ITEMITEM <br />May 22, 2017May 22, 2017AppropriationAppropriation <br />Agenda Date Requested:Agenda Date Requested: <br />Fund 038Fund 038 <br />Traci LeachTraci LeachSource of Funds:Source of Funds: <br />Requested By:Requested By: <br /> <br />Economic Development/TourismEconomic Development/TourismAccount Number:Account Number: <br />Department: <br /> <br />Report:Resolution:Resolution:Ordinance:Ordinance:Amount Budgeted:Amount Budgeted: <br />98,00098,000 <br />Amount Requested:Amount Requested: <br />Exhibits: <br />Budgeted Item:Budgeted Item:YESYESNONO <br />1.Location MapLocation Map <br />2.Trail MasterplanTrail Masterplan <br />SUMMARY & RECOMMENDATIONSSUMMARY & RECOMMENDATIONS <br />At the March 27, 2017 EDC Board meeting, staff solicited project ideas from the Board regarding the upcoming At the March 27, 2017 EDC Board meeting, staff solicited project ideas from <br /> the Board regarding the upcoming <br />FY18 budget. At that time, sidewalks along Spencer Highway from Valley Brook to Underwood was identified as FY18 budget. At that time, sidewalks along Spencer Highway from Valley Brook <br /> to Underwood was identified as <br />a project that the Board would like to explore. a project that the Board would like to explore. <br />The Spencer Highway corridor is included in the CityThe Spencer Highway corridor is included in the Citys Trail masterplan. The stretch between Valley Brook and s Trail masterplan. <br /> The stretch between Valley Brook and <br />Underwood is approximately 2,184 linear feet. Based on the CityUnderwood is approximately 2,184 linear feet. Based on the Citys most recent sidewalk contract, the cost to s most recent <br /> sidewalk contract, the cost to <br />construct a 5wide sidewalk would be $70,000 and includes construction of ADA ramps where required and a wide sidewalk would be $70,000 and includes construction of ADA ramps where <br /> required and a <br />few manhole adjustments based on the location and limited rightfew manhole adjustments based on the location and limited right--ofof--way. This cost does not include design, way. This <br /> cost does not include design, <br />geotechnical testing, contingency amount for unforeseen field conditions, bonding/insurance, or construction geotechnical testing, contingency amount for unforeseen field conditions, <br /> bonding/insurance, or construction <br />inflation. Staff would recommend including at least 40% to cover all of these costs. inflation. Staff would recommend including at least 40% to cover all of these costs. <br /> There is one critical issue that may complicate this project There is one critical issue that may complicate this project-- the proposed beautification wall along Spencer the proposed <br /> beautification wall along Spencer <br />Highway. In the FY17 budget, half of the proposed budget for this project is included in the EDC budget. The Highway. In the FY17 budget, half of the proposed budget for this project <br /> is included in the EDC budget. The <br />FY18 budget will include the second part of the funding. Location has yet to be determined. Given the extremely FY18 budget will include the second part of the funding. Location has <br /> yet to be determined. Given the extremely FY18 budget will include the second part of the funding. Location has yet to be determined. Given the extremely FY18 budget will include <br /> the second part of the funding. Location has yet to be determined. Given the extremely <br />limited right-ofof--way available along Spencer Highway, there may not be adequate room to include the sidewalk. way available along Spencer Highway, there may not be adequate room <br /> to include the sidewalk. <br />Design work has not yet begun for the beautification screening wall. Design work has not yet begun for the beautification screening wall. <br /> Should the Board like to move forward and include this in the EDC FY18 budget, staff would recommend Should the Board like to move forward and include this in the EDC FY18 budget, <br /> staff would recommend <br />including this within the scope of work for the beautification wall to ensure a comprehensive design and add including this within the scope of work for the beautification wall to ensure <br /> a comprehensive design and add <br />$98,000 to the beautification budget to account for this additional scope of work.$98,000 to the beautification budget to account for this additional scope of work. <br />Action Required by the La Porte Development Corporation:Action Required by the La Porte Development Corporation: <br /> <br />Consider approval or other action to include sidewalks on Spencer Highway from Valley Brook to Underwood in Consider approval or other action to include sidewalks on Spencer Highway <br /> from Valley Brook to Underwood in <br />the FY18 beautification screening wall budget in an amount not to exceed $98,000.the FY18 beautification screening wall budget in an amount not to exceed $98,000. <br />Approved for the La Porte Development Corporation AgendaApproved for the La Porte Development Corporation Agenda <br />Corby D. Alexander, City ManagerCorby D. Alexander, City ManagerDateDate <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.