Laserfiche WebLink
West A Street <br />Concrete Pavement : <br />Remove Existing Pavement <br />Lime Stabilization <br />Fly Ash Stabilization <br />10 Inch Rienforced Concrete Pavement <br />Total <br />Aspahlt Pavement: <br />Remove Existing Pavement <br />Lime Stabilization <br />Fly Ash Stabilization <br />Limestone Base <br />1.5 Inch HMAC <br />Subtotal <br />Maintenance (resurface every 7 years) <br />Total <br />West 17th Street <br />Concrete Pavement <br />Remove Existing Pavement <br />Lime Stabilization <br />Fly Ash Stabilization <br />10 Inch Rienforced Concrete Pavement <br />Total <br />Aspahit Pavement: <br />Remove Existing Pavement <br />Lime Stabilization <br />Fly Ash Stabilization <br />Limestone Base <br />1.5 Inch HMAC <br />Subtotal <br />Maintenance (resurface every 7 years) <br />Total <br />1442 <br />SY <br />$7.00 <br />$10,095.56 <br />36 <br />Ton <br />$75.00 <br />$2,704.17 <br />14 <br />Ton <br />$145.00 <br />$2,091.22 <br />1442 <br />SY <br />$36.00 <br />$51,920.00 <br />$66,810.94 <br />1442 <br />SY <br />$7.00 <br />$10,095.56 <br />36 <br />Ton <br />$75.00 <br />$2,704.17 <br />14 <br />Ton <br />$145.00 <br />$2,091.22 <br />811 <br />Ton <br />$30.00 <br />$24,337.50 <br />105 <br />Ton <br />$75.00 <br />$7,909.69 <br />$47,138.13 <br />7 <br />EA <br />$7,909.69 <br />$55,367.81 <br />$102,505.94 <br />1980 <br />SY 1 <br />$7.00 <br />$13,860.00 <br />50 <br />Ton <br />$75.00 <br />$3,712.50 <br />20 <br />Ton <br />$145.00 <br />$2,871.00 <br />1980 <br />SY <br />$36.00 <br />$71,280.00 <br />$91,723,50 <br />1980 <br />SY <br />$7.00 <br />$13,860.00 <br />50 <br />Ton <br />$75.00 <br />$3,712.50 <br />20 <br />Ton <br />$145.00 <br />$2,871.00 <br />1114 <br />Ton <br />$30.00 <br />$33,412.50 <br />145 <br />Ton <br />$75.00 <br />$10,859.06 <br />$64,715.06 <br />7 <br />EA <br />$10,859.06 <br />$76,013.44 <br />$140,72850 <br />