My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
04-28-11 Zoning Board of Adjustment
LaPorte
>
Agendas
>
.AGENDAS
>
Open Meetings
>
Planning & Zoning Commission
>
Planning/Inspections
>
Zoning Board of Adjustment
>
2011
>
04-28-11 Zoning Board of Adjustment
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2011 3:51:11 PM
Creation date
11/21/2024 8:21:55 AM
Metadata
Fields
Template:
La Porte TX
Document Type
Agenda PACKETS
Date
4/28/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Facts relevant to this matter <br />I bought the property in May of 2010. <br />A contactor widened and lengthened the driveway. <br />The contractor built the driveway according to the driveway detail sheets. <br />The detail sheets do not mention maximum coverage. <br />The contractor did not obtain a permit from the city. <br />If the contractor would have got a permit this would not have happened. <br />I assume the responsibility of not getting a permit. <br />The property has 56.1% coverage where 55% is the maximum allowed. <br />Type of relief sought <br />I am requesting to leave the 1.1% (75.9sf) concrete overage in place. <br />Grounds for the request <br />The excess coverage was not intentional. <br />The excess is only 1.1% over the 55% maximum allowed. <br />It would be expensive to saw cut and jackhammer out reinforced concrete. <br />There are properties in the area with a higher % of coverage than mine. <br />
The URL can be used to link to this page
Your browser does not support the video tag.