Laserfiche WebLink
<br />( <br /> <br />( <br /> <br />( <br /> <br />( <br /> <br />( <br /> <br />( <br /> <br />( <br /> <br />( <br /> <br />( <br /> <br />( <br /> <br />( <br /> <br />c. <br /> <br />( <br /> <br />( <br /> <br />( <br /> <br />( <br /> <br />( <br /> <br />(, <br /> <br />'. <br /> <br />Page 5 <br /> <br />3.' Along W. Tar between N. 11 th and N. '.th 700 feet of' 6" <br />C-900 water main with one new fire hydrant. This is a new line <br />to extend servioe to homes and a business that was on private <br />well-water. <br />Approximate Cost: $4,850.' materials <br /> <br />4. Between 4th and 5th from Adams to Tyler then along Tyler <br />from 250 feet. 650 feet of 2" PVC water main. This line <br />replaoed a 1" steel main and oonneoted between two 6" mains. <br />Approximate Cost: $2,600. materials <br /> <br />5. Along W. Madison between 8th and Highway 146, 150 feet of <br />6" PVC sewer line with o~e manhole. <br />Approximate Cost: $1,250. materials <br /> <br />6. Between N. 11th and Highway 146 from W. Madison to N. "E", <br />4-0 feet of 6" pvc sewer line. , <br />Approximate Cost: $2,200. materials <br /> <br />7. Between N. 5th and N. 6th from Tyler to Madison, 550 feet <br />of 6" PVC sewer, line wi~h one manhole. This line replaoed a <br />deteriorated oonorete line. <br />Approximate Cost.: $4,025. materials <br /> <br />Current Year BUdgeted <br />1. Between N. 3rd and N. 4th <br />feet of 4" PVC water main. <br />main. <br />Approxima~e Cost: $2,100. materials <br /> <br />10,1~0. <br />Street from Tyler to Madison, 540 <br />This will replaoe a 1" steel water <br /> <br />2. Between <br />8" SD~ 35 <br />sewer line. <br />Approximate <br /> <br />N. 3rd and N. 4th from Main to Adams, 800 feet of <br />sewer m~in. This will' replaoe a deteriorated 6" <br /> <br />Cost: $4,400. materials <br /> <br />3. Along W. Tyler <br />35 sewer main. <br />tanks. <br />Approximate Cost: <br /> <br />from N. 11th to N. 13th, 660 feet of 8" SDR <br />This is a new line to eliminate six septio <br /> <br />$3,630. materials <br /> <br />Total' <br /> <br />$41,705.... <br /> <br />This list does not oonsider regular operational funotions, suoh <br />as approximately 19 sewer point repairs, eto. <br /> <br />Misoellaneous: <br /> <br />1982-1983 Aotual Expenditure <br /> <br />1983-1984 Current Operations-- <br />Community Transportation <br />Federal Revenue Sharing <br /> <br />$8,000. <br /> <br />$ 2,500. <br /> <br />The Attorney General has sixty days in whioh to oonsider a <br />oompleted submission pursuant to Seotion 5. This sixty-day review <br />period will begin when this Department reoeives the information <br />neoessary for the proper evaluation of the ohange you have <br />submitted. See the'Prooedures for the Administration of Seotion 5 <br />(28 C.F.R. 51.35(a)). Further, you should be aware that if no <br />response is reoeived within sixty days of this request, the Attorney <br />General may objeot to the proposed ohange oonsistent with the burden <br />of proof plaoed upon the submitting authority. See also 28 C.F.R. <br />51.38. Therefore, please inform us of the oourse of aotion the City <br />of La Porte plans to take to comply with this request. <br /> <br /> ( <br /> ,( <br /> (" <br /> ( <br /> ( <br /> ( <br /> ( <br /> ( <br />" ( <br /> ( <br /> ( <br /> ( <br /> ( <br /> ( <br /> E' <br /> l <br /> <.. <br /> l <br /> L <br /> E' <br /> L <br /> .l <br />