My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Interlocal agreement with Harris County F101
LaPorte
>
City Secretary
>
.DEEDS
>
F101 Drainage Project-warranty deeds,agreement
>
Interlocal agreement with Harris County F101
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/21/2011 11:22:44 AM
Creation date
11/25/2024 11:30:45 AM
Metadata
Fields
Template:
La Porte TX
Document Type
Deeds
Date
8/2/1988
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />e <br /> <br />e <br /> <br />ARTtCLE VI II . <br /> <br />. <br /> <br />If an acceptable bidder does no~ respond to the advertisement or fails .to <br />execute the construction contract, :or fails to provide the bonds required by <br /> <br />I <br /> <br />law; either party may rescind this agreement by giving thirty (30) days <br />written notice to the other party,; as provided for in Article XIV. of this <br /> <br />agreement. <br /> <br />ARTICLE IX. <br /> <br />The District shall have the right to make any changes in the plans and <br /> <br />. <br />specifications as its Engineer may' deem necessary or desirable during the <br />construction of the Project within; scope of the Drainage Plan without notice <br />to the City. However, the Ci ty sh~ll not be obligated to expend any funds in <br />excess of those hereinbefore speCifically allocated by the City for the <br /> <br />Project as a result of any change in: said plans or specifications. <br /> <br />ARTICLE X. <br /> <br />To the extent of the City's funds provided for herein and to the extent <br /> <br />such action is feasible, the District will use its best efforts to complete <br /> <br />the following portions of the Project, including related engineering, <br /> <br />acquistion of right-of-way, construction and construction services, by October <br /> <br />31, 1988. <br /> <br />- Watershed study for Unit FIOl-OO-OO <br />- watershed Design for Unit FlOl-OO-OO <br /> <br />- Right-of-Way acquist~on <br />- Replacement of Sens Road Bridge <br /> <br />- Replacement of Valley View Drive Bridge <br /> <br />- Channel improvements from state Highway 146 extending <br />approximately 2000 feet down stream <br /> <br />-Page 4- <br /> <br />~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.