My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
CLP Flood Control Project Settlement with Cynthia L Colvin Trust with Addendum to settlement agreement
LaPorte
>
City Secretary
>
.DEEDS
>
Special Warranty Deeds
>
2000's
>
2007
>
CLP Flood Control Project Settlement with Cynthia L Colvin Trust with Addendum to settlement agreement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2008 10:51:11 AM
Creation date
11/25/2024 11:31:58 AM
Metadata
Fields
Template:
La Porte TX
Document Type
Deeds
Date
6/29/2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />D. On August 28,2006, the City of La Porte closed portions ofE and F Streets, <br /> <br />but did not close the intersection of E Street and South 13 th Street and closed the north <br /> <br />half only of the intersection of F Street and 13 th Street. The total square footage of those <br /> <br />portions of E and F Streets originally proposed to be closed in the Agreement, but <br /> <br />retained by La Porte, is equal to 11,750 square feet, and as reflected on Exhibit A <br /> <br />attached hereto. These closures were made before the original Agreement, or a modified <br /> <br />agreement incorporating changes to the closure of E and F Streets reflecting the actual <br /> <br />closures by City Council, were presented to City Council for ratification. <br /> <br />E. To resolve the continuing issues over the matters in dispute, the parties have <br /> <br />agreed to adopt the Agreement and this Addendum thereto as containing the terms of the <br /> <br />settlement of this matter. <br /> <br />F. Without admitting any liability or fault, the Parties have also agreed to settle <br /> <br />all disputes they have relating to the Lawsuit or the facts underlying the Lawsuit. <br /> <br />The terms of the settlement of this matter, as reflected in the proposed Agreement <br /> <br />and this Addendum, are as follows: <br /> <br />1. To compensate Colvin for the amount of square footage lost as a result of <br /> <br />the retention of 11,750 square feet of E and F streets, La Porte agrees to release, and <br /> <br />allow Colvin to retain portions of Block 829, lots 1 thru 16, which otherwise was to be <br /> <br />conveyed to La Porte under the terms of the Agreement. Specifically, La Porte agrees that <br /> <br />Colvin is entitled to retain lots 1 thru 4, Block 829, whereas lots 1 thru 4 contain <br /> <br />--2-- <br />
The URL can be used to link to this page
Your browser does not support the video tag.