Laserfiche WebLink
<br />. <br /> <br />e <br /> <br />UTIL. EXTEN. AGREEMENT (for privately-funded extensions), Page 2 <br /> <br />(3) City hereby agrees to the construction and installation of <br />an extension of its utility Maines) to said property <br />commencing at the nearest existing utility main(s) of <br />sufficient size and capacity, thence along/thru City of <br />La Porte rights of way and/or easements to said Owner's <br />property, provided, however, that should City not possess <br />all necessary rights-of-way and/or easements to complete <br />said extension(s), Owner shall be solely responsible for <br />obtaining said additional rights-of-way and/or easements at <br />no cost to City. Such extension(s) shall be of sufficient <br />size and capacity to serve all existing developed property <br />to be served by the new extension(s). City shall be the <br />final authority in determining sufficiency of the size and <br />capacity of the extension(s). <br /> <br />(4) Owner agrees to pay all fees for right of way or easement <br />acquisition, surveying, engineering, preparation of <br />contract documents, soils investigations, permits, bidding, <br />construction staking, construction administration and <br />inspection, materials testing and preparation of record <br />drawings. Owner further agrees to pay all costs related to <br />the construction and installation of said line(s), <br />including necessary appurtenances in conformance with <br />City's standards and specifications for said extension(s). <br /> <br />Page 2 of 5 <br />