My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
City of La Porte Sanitary Sewage Pipeline Easement
LaPorte
>
City Secretary
>
.EASEMENTS
>
1980's
>
1985
>
City of La Porte Sanitary Sewage Pipeline Easement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/19/2009 12:58:17 PM
Creation date
11/26/2024 9:26:43 AM
Metadata
Fields
Template:
La Porte TX
Document Type
Easements
Date
10/26/1985
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />.... . <br /> <br />.. <br /> <br />e. <br /> <br />e <br /> <br />. , ,.... <br />.... ..... ~ <br /> <br />029-=-78=1254 <br /> <br />TEXAS HIGHWAY DEPARTMENT <br /> <br />Specifications for Placing Utility Lines Within the <br />Right of Way of State-Maintained Highways <br /> <br />1. All excavations within the right of way and not under surfacing <br />shall be backfilled by tamping in 6-inch horizontal layers and/or <br />as directed. All surplus material shall be removed from the right <br />of way and the excavation finished flush with surrounding natural <br />ground. <br /> <br />2. Where sodding is disturbed by excavation or backfilling operations, <br />such areas shall be replaced by seeding. Slopes 4:1 or steeper <br />shall be replaced by block sodding. This work shall be in accord- <br />ance with Highway Department specifications. <br /> <br />3. <br /> <br />Highway crossings under surfaced roads and <br />within the right of way shall be placed'by <br />extend from crown line to crown line. All <br />shall be enclosed in satisfactory casing. <br />under highways shall be cast iron pipe. <br /> <br />surfaced, crossroads <br />boring. Boring shall <br />lines carrying pressure <br />Gravity flow sewer lines <br /> <br />4. Use of water or other fluids in connection with boring operations <br />will be permitted only in sufficient quantity to lubricate boring <br />bit and provide a smooth flow of cuttings. Jetting will not be <br />permitted. <br /> <br />5. Pipeline material and design for high pressure lines must meet the <br />minimum Federal Safety Standards for Liquid and Gas Pipelines. <br /> <br />6. Operations on the highways shall be performed in such a manner that <br />operating equipment and excavated material are kept off the pavement <br />at all times. <br /> <br />7. Barricades and warning signs, and flagmen when necessary, shall be <br />provided by the contractor or owner. One-half the traveled portion <br />of the roadway must be open to traffic at all times. <br /> <br />8. Work performed on railroad right of way is subject to the concur- <br />rence of the railroad company. Work performed within waterways, <br />such as rivers, creeks, bayous, and drainage ditches, is subject <br />to the. concurrence of the appropriate governmental agency. <br /> <br />9. All manhole covers shall be installed flush with ground level. <br /> <br />The roof of communications manholes shall be at least five feet <br />below ground level. <br /> <br />Return to:' City of La Porte <br />Attn: City Secretary <br />P.O. Box 1115 <br />La Porte. TX 77~71 <br /> <br />EXHIBIT,n~d:~...EAGe 'I, <br />
The URL can be used to link to this page
Your browser does not support the video tag.