Laserfiche WebLink
<br />',' <br /> <br />e <br /> <br />e <br /> <br />G9;1~~~56:'1333 <br /> <br />SMC/s 08/13/92 <br /> <br />EXHIBIT B <br />PAGE 1 OF 2 <br /> <br />CONDITIONS AND RESERVATIONS FOR PIPELINES <br /> <br />The easement herein granted is subject to the following conditions and <br />reservations: <br /> <br />1. Grantor herein retains for itself, its successors and assigns, the <br />right to fully use and enjoy said premises, except as the same may be <br />necessary for the purposes herein granted. <br /> <br />2. Grantee hereby binds itself. its successors, assigns, agents. and <br />licensees to indemnify and hold harmless Grantor from and against any <br />and all claims. actions. causes of action, demands, liabilities. <br />costs, losses, expenses. and damages, in contract, strict liability, <br />or in tort, for injury to any person (including death) or damage to <br />any property arising out of or in any way connected with the construc- <br />tion, use and existence of said pipeline on Grantor's property, where <br />such injury or damage is caused by the sole, joint, concurrent, <br />contributing or comparative negligence or fault of Grantee. its <br />agents, or employees, and even when caused by the joint, concurrent, <br />contributing or comparative negligence or fault of Grantor, its agents <br />or employees. This indemnity shall not be applicable where the injury <br />or damage is caused by the sole negligence of the Grantor. its agents <br />or employees. <br /> <br />3. Grantee, its successors and assigns. assumes all costs resulting <br />from any temporary or permanent alterations to or changes in the <br />structure support arrangement or installation (including, but not <br />limited to, temporary guying, strengthening of structures and addi- <br />tional ground line treating of poles due to the disturbing of the <br />earth around the base of poles) of any of Grantor's structures or <br />improvements located near the easement herein granted and made neces- <br />sary by the construction, maintenance, operation. and removal of said <br />pipeline or any use consistent with the purposes of this easement by <br />Grantee, its successors or assigns. <br /> <br />4. Grantee, its successors and assigns, will conduct the installa- <br />tion, maintenance, operation, repair and removal of said pipeline in <br />such a manner as to limit the extent of damage to the surface of <br />Grantor's land to a minimum. <br /> <br />5. Grantee, its successors and assigns. will obtain from Grantor, its <br />successors and assigns, specific approval of each item of accessory <br />equipment to be associated with, or installed on. said pipeline prior <br />to such actual association or installation of said equipment. which <br />approval shall not be unreasonably withheld. <br /> <br />6. In the event that Grantee, its successors and "assigns, shall <br />abandon such right-of-way, this grant shall immediately terminate and <br />all rights hereunder shall there-upon revert to Houston Lighting & <br />Power Company, its successors and assigns. and Grantee shall further. <br /> <br />Return to: City Secretary <br />City of La Porte <br />P,'O. Box 1115 <br />La Porte, Tx 77572-1115 <br />