My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Houston Lighting & Power Company Easement
LaPorte
>
City Secretary
>
.EASEMENTS
>
1990's
>
1993
>
Houston Lighting & Power Company Easement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/27/2009 8:56:47 AM
Creation date
11/26/2024 9:26:55 AM
Metadata
Fields
Template:
La Porte TX
Document Type
Easements
Date
7/12/1993
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />..... I., b <br /> <br />e <br /> <br />e <br /> <br />"16~":"56.: "1335 <br /> <br />G92-028 <br />SMC/s 08/14/92 <br /> <br />EXHIBIT C <br />PAGE 1 OF 3 <br /> <br />CONSTRUCTION REQUlR.EMENTS FOR PIPELINES ON <br /> <br />HOUSTON LIGHTING & POVER. COMPANY'S SUBSTATION AND <br /> <br />POWER. PLANT PROPERTIES AND IUGHT-OF-VAYS <br /> <br />As a prerequisite to pipeline installation on Houston Lighting & Power <br />Company's fee property or easements, hereinafter called Right-of-Way, Grantee, <br />its successors and assigns, shall agree to and be responsible that its contrac- <br />tor and/or subcontractors abide by the following construction requirements: <br /> <br />1. Grantee, its successors and assigns, is responsible for notify- <br />ing all parties having an-interest-in or an-easement-on, under, or <br />above the Right-of-Way. The construction requirements of these <br />concerned parties with prior rights shall be observed; however, <br />Houston Lighting & Power Company's construction requirements shall be <br />adhered to as a minimum. <br /> <br />2. Houston Lighting & Power Company's Transmission Engineering <br />Division (713-228-9211) shall be notified seven (7) days prior to <br />beginning ANY TYPE of work so that inspection may be arranged. <br />Grantee shall give the name and telephone number of its representa- <br />tive, or inspector responsible for the pipeline installation, to <br />insure that a preliminary and final inspection of Houston Lighting & <br />Power Company's structures and Right-of-Way will be performed. The <br />repair of damages to Houston Lighting & Power Company's facilities, <br />caused by the Grantee's contractor, shall be paid by Grantee. No work <br />for initial installation shall be performed on Saturdays, Sundays, or <br />Holidays on Houston Lighting & Power Company's Right-of-Way unless <br />approved by Houston Lighting & Power Company. <br /> <br />3. ~rantee's representative, agent, or inspector shall have a copy <br />of the signed agreement or letter of authority to construct pipelines <br />on Houston Lighting & Power Company's Right-of-Way at the construction <br />site whenever ANY TYPE of work is being performed on the Right-of-Way. <br /> <br />4. Any violation of the requirements contained herein shall be <br />considered as grounds, by Houston Lighting & Power Company's inspec- <br />tor, to cause construction to cease until corrective actions are <br />taken. If the contractor fails or refuses to modify his procedures in <br />an acceptable manner, the attached easement may be declared null' and <br />void upon written notification by Houston Lighting & Power Company to <br />Grantee. <br /> <br />5. Under no circumstances will the natural drainage pattern of the <br />Right-of-W~y be blocked by construction. <br /> <br />6. Pipelines shall have <br />longitudinal installations <br /> <br />Rttum to: 'Cltt/secnJlaly <br />City of La Po". <br />P. O. Box 11f. <br />La pone, TX 17172-111' <br /> <br />a minimum cover of four <br />and four (4) feet for <br /> <br />(4) feet for <br />perpendicular <br />
The URL can be used to link to this page
Your browser does not support the video tag.