Laserfiche WebLink
<br />II. <br /> <br />Construction <br /> <br />Only after receipt of the notice of the approval of the Plans and Specifications from the District, the <br />City, at the City's sole expense, shall commence to construct, and shall proceed diligently until <br />completed (but in no event longer than one (1) year from the commencement of construction of the <br />Trail, unless the Director determines in his sole discretion that good cause exists to extend the time <br />in which the Trail is to be completed), the Trail in a good and workmanlike manner and in substantial <br />accordance with the Plans and Specifications, which have been approved in advance by the District <br />for such purposes. If any conflict arises between the provisions of the Plans and Specifications and <br />the provisions of this Agreement, this Agreement shall be controlling and binding upon the parties <br />hereto. <br /> <br />III. <br /> <br />Maintenance and Repair <br /> <br />The City shall maintain in good repair and in safe condition the Trail, including but not limited to, <br />repair of slope, pavement, bridges, stairways, landscaping, irrigation features, traffic control signs, <br />light fixtures, electrical equipment, and all other improvements and appurtenances constructed or to <br />be constructed along the Trail. The City acknowledges that the Trail or one or more of its <br />improvements and appu rtenances could adversely affect the condition of the Property's flood control <br />features. Therefore, in the event the District's Director, in his sole discretion, determines that the <br />Trail or one or more of its improvements and appurtenances has caused damage or destroyed a <br />flood control feature of the Property, then all such property of the District so damaged or destroyed <br />shall be promptly repaired or replaced by the City to the satisfaction of the District's Director. <br />However, in lieu of said repair or replacement, the City shall, if so required by the District's Director, <br />pay to the Harris County Flood Control District money in an amount deemed sufficient by the <br />District's Director, in his sole discretion, to compensate for the loss sustained by the District as a <br />result of damages or destruction to said flood control features. The City shall perform its obligations <br />as specified herein regardless of who or what necessitated the repairs or replacement and without <br />the aid or assistance of the District or the District's equipment, personnel, or materials. The City <br />shall mow, edge, and trim the grass between the Trail and the District right-of-way line and between <br />the Trail and the top of the bank on the side of the channel on which the Trail is located, hereinafter <br />called the "Maintenance Area." The City shall mow, edge, and trim the said grass at such time <br />intervals so as to keep same from attaining a height of more than nine (9) inches. The City shall <br />remove the trash, paper, debris, and accumulated silt from the Trail and Maintenance Area at such <br />time intervals so as to keep the Trail and Maintenance Area neat and tidy at all times. The City shall <br />also pick up the trash and debris that collects on any other improvements or appurtenances <br />associated with the Trail. All maintenance required as hereinabove set forth shall be the sole <br />responsibility of the City. <br /> <br />IV. <br /> <br />Trail Alteration and Inspection <br /> <br />The City will not undertake any alteration to the Trail, any existing improvements thereto, or begin <br />any construction without first securing the written approval of an authorized representative of the <br />District of the plans and specifications for the same. With the prior written consent of an authorized <br />representative of the District, the City may make minor changes in the Plans and Specifications <br />necessary or desirable during the construction of the Trail. <br /> <br />- 2 - <br />