Laserfiche WebLink
<br />TABLE OF CONTENTS <br /> <br />i~ <br /> <br />;11 <br />-\\1 <br />'~ <br />11.1 <br /> <br />SECTION TITLE PAGE <br />L General Procedures and Guidelines 2 <br /> A. General 2 <br /> B. 1\pprovalProcedure 2 <br /> C. General Guidelines For Hot Taps 4 <br />II. Conditions Governing Construction and Installation of Facilities 6 <br /> and Improvements 1\cross CW 1\ Easements <br /> A. General 6 <br /> B. Plan and Profile Drawings 7 <br /> C. Record Drawings 8 <br /> D. Underground Lines, Pipelines, Conduits or Cables 8 <br /> E. 1\boveground Lines, Pipelines, Conduits, Cables or Pole Lines 9 <br /> F. Roadways 9 <br /> G. Railroads 10 <br />H. Surface Static Loads and Material Storage 10 <br /> I. Ditches 10 <br /> 1. CW 1\ Staff, CW 1\' s Consultant Engineer, Pipeline 11 <br /> Owner's Representatives and Construction Inspectors <br />K. 1\dministration and Construction Inspection Fees 11 <br />III. Specifications for Underground Pipelines and Other <br /> Utilities Crossing The Distribution System 12 <br />A. General Requirements 12 <br />B. Crossing Over CW 1\ Facilities 12 <br />C. Crossing Under CW 1\ Facilities 12 <br />D. Markers Signs 13 <br />E. Spoil Materials or Equipment Over CW 1\ Pipelines 13 <br />F. Excavation Backfill Requirements 13 <br />IV. Specifications for Pipeline Crossings of the Main Canal, Cedar <br /> Point Lateral and Lateral Canals 13 <br />A. Minimum Ground Cover 13 <br />B. Pipeline Crossing Requirements 14 <br />C. Installation of Pipelines and Casings 14 <br />D. Removal of 1\bandoned Pipelines, Casings and Vents 14 <br />E. Excavation Backfill for Pipeline Installations or Relocations 15 <br />V. 1\ddendum - Indemnifications Requirements 15 <br /> <br />~I <br />\t~1 <br />i'~1 <br />~~~t <br />I <br />j <br />W <br />r't1 <br />C~ <br /> <br />~ <br />1lj11 <br />''''I <br /> <br />Page 1 of 16 <br />