My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Coastal Water Authority-grantor of pedestrian and bicycle easement
LaPorte
>
City Secretary
>
.EASEMENTS
>
2000's
>
2011
>
Coastal Water Authority-grantor of pedestrian and bicycle easement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2011 11:04:25 AM
Creation date
11/26/2024 9:27:14 AM
Metadata
Fields
Template:
La Porte TX
Document Type
Easements
Date
1/24/2011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />with a vault. Coating on the valves shall be mortar. Force will not be applied to the <br /> <br />Tapping Valve to align with extended piping. <br /> <br />5. Routing of Service Line - The routing ofthe service line across the CW A right-of-way <br /> <br />shall be such that future pipelines to be installed by CW A are not impacted by the <br /> <br />horizontal alignment and vertical profile of the service line. Criteria for the service line <br /> <br />such as depths, clearances, etc. are given in Section m. The horizontal alignment and <br /> <br />vertical profile of the service line will be evaluated on a case-by-case basis. <br /> <br />6. Corrosion Protection - The hot tap saddle, piping and valves shall be coated in <br /> <br />accordance with the CW A piping to be consistent with the existing corrosion protection <br /> <br />~~ <br />Ul <br />~ <br />i,fi~ <br />I <br />I <br />\~ <br />~ <br />i <br />r <br />, ~ <br />\i,l <br />~ <br />0 <br />~, 7. <br />~\iI <br />!~' <br />~I <br /> <br />system. Mortar coating shall be required. If the service line piping material downstream <br /> <br />of the hot tap piping and valves is electrically conductive such that corrosion may <br /> <br />develop, an insulating flange gasket shall be provided between the hot tap piping/valves <br /> <br />and the service line piping. If an insulating flange is provided, two test leads shall be <br /> <br />installed on the pipe on each side of the insulating flange and brought to the ground <br /> <br />surface at a test station mounted above ground. <br /> <br />Thrust Restraint - The service line owner shall assess and provide the necessary thrust <br /> <br />restraint required by the hot tap arrangement. <br /> <br />II. CONDITIONS GOVERNING CONSTRUCTION AND INSTALLATION <br />OF FACILITIES AND IMPROVEMENTS ACROSS OR IN PROXIMITY <br />TO CW A EASEMENTS <br /> <br />A. GENERAL <br /> <br />1. All facilities or improvements constructed on CW A right-of-way shall be constructed <br /> <br />and maintained in a manner that will avoid any conflict with CW A's existing facilities or <br /> <br />future facilities. CWA may impose requirements in addition to those stated herein if in <br /> <br />Page 6 of 16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.