My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
06-27-80 Cablevision/Harte-Hanks progress/development of cable TV system
LaPorte
>
.Ordinances
>
Franchises
>
Cable
>
Correspondence
>
06-27-80 Cablevision/Harte-Hanks progress/development of cable TV system
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2024 3:47:56 PM
Creation date
11/26/2024 9:42:08 AM
Metadata
Fields
Template:
La Porte TX
Document Type
Contracts/Leases/Agreements
Date
6/27/1980
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
RICHARD H. CLESTER <br />PRESIDENT <br />PASADENA CATV, LTo. <br />hARTE-hANkS COMMUNICATIONS, INC. <br />PASADENA CATV, LTD. <br />2223 STRAWBERRY RD., PASADENA, TX. 77SO2 <br />March 31, 1980 <br />Mayor J. J. Meza <br />LaPorte City Hall <br />P. 0. Box 1115 <br />LaPorte, Texas 77571 <br />RE: Construction Progress Report <br />LaPorte Cable TV Project <br />Dear Mayor Meza: <br />713-477-2581 <br />For purposes of keeping all appropriate parties informed, I thought a brief <br />written Periodic progress report as to the events that have taken place to <br />date in `the LaPorte Cable TV project would be in order. <br />1. The strand mapping process was completed last week. This is a major step <br />in constructing a cable TV system and makes it possible for us to progress <br />to the design stage. <br />2. Desig0. <br />n of the system is underway at the moment and should be completed by <br />May 15 unless there are unexpected delays. As soon as the design is completed <br />we will be able to commence electronics and other necessary materials. <br />3. A tenative site has been selected for the transmitter and communications <br />operations. At the moment we are in the process of completing Microwave <br />Path Profile Studies, Compucon Microwave Studies, site borings and obtaining <br />FCC clearances, etc. Assuming that the location "passes muster" we hope to <br />conclude this issue within the next few weeks. <br />4. A number of contracts are under negotiation for construction of building, <br />microwave equipment, transmitting equipment, cable and other requirements <br />that are necessary to build a system. Everything appears to be on schedule <br />or ahead of schedule at the moment. <br />5. All franchise requirements concerning insurance, permits, etc. required to <br />date have been forwarded to the City Clerk. To the best of my knowledge, <br />all franchise obligations required at this point have been fulfilled. <br />Generally the project is on schedule or ahead of schedule in all areas at this <br />time. <br />RHC:jjf <br />cc: John McDonough <br />George Yeiter <br />Gail Horany <br />Best personal regards, <br />1 <br />, Cz�-4 U-P-* <br />Richard H. Clester <br />Donna Grantom <br />Jim Schindeldecker <br />Knox Askins <br />
The URL can be used to link to this page
Your browser does not support the video tag.