Laserfiche WebLink
CENTERPOINT ENERGY ENTEX <br /> TRANSPORTATION SERVICE <br /> TEXAS COAST DIVISION <br /> RATE SCHEDULE NO.T-90 C <br /> NET MONTHLY RATE(cont'd) <br /> (C) Effective with all bills calculated on and after July 11,2019,the Net Monthly Rate for gas transported under <br /> this Rate Schedule for all gas transported and delivered to the facilities of an End-use Customer with a CD,as defined <br /> herein,greater than or equal to 100 MMBtu during a billing period shall be equal to the sum of: <br /> (i) ' Customer Charge @ $1,167.58; <br /> (ii) Administrative Charge @ $4.0000/MMBtu of Contract Demand,as defined herein; <br /> (iii) Distribution Charge @ $0.1125/MMBtu <br /> (iv) Payments to Government Authorities,as defined herein. <br /> CONTRACT DEMAND <br /> Each individually metered point of delivery or aggregated points of delivery shall have a Contract Demand("CD") <br /> calculated in MMBtu and equal to the higher of: <br /> (i) The Initial CD shall equal the average daily usage of the individually metered point of delivery or aggregated <br /> points of delivery for the sixty(60)month period ended June 30,2018 for all gas consumed; <br /> a. for individually metered points of delivery or aggregated points of delivery that have at least twelve <br /> (12)months of gas consumption but less than sixty(60)months of gas consumption,the Initial CD <br /> shall equal the average daily usage of the individually metered point of delivery or aggregated points <br /> of delivery for the period in which the point(s)have been consuming natural gas and will updated <br /> annually every July 1 until there is a history of sixty(60)months of gas consumption; <br /> b. for individually metered points of delivery or aggregated points of delivery that have gas <br /> consumption measured in Mcf but do not gas consumption measured in MMBtu,the MMBtu for <br /> those months that were measured in Mcf only shall be calculated by multiplying each month's <br /> measured Mcf by an assumed Btu factor of 1.025; <br /> c. for individually metered points of delivery or aggregated points of delivery that are new to the <br /> distribution system and have no current gas consumption, the Initial CD shall be specified in the <br /> initial Exhibit A,as described in the Company's General Terms and Conditions for Transportation <br /> Service for this Rate Schedule; <br /> d. for individually metered points of delivery or aggregated points of delivery that experience an <br /> operational change that materially affects the level of natural gas usage by the individually metered <br /> point of delivery or aggregated points of delivery;then a new Initial CD shall be calculated taking <br /> into account those operational changes;such Initial CD shall remain in effect until the individually <br /> metered points of delivery or aggregated points of delivery have at least twelve (12) months of <br /> measured MMBtu under the new level of natural gas usage; <br /> (ii) Beginning July 1,2019 and each July 1 thereafter,the Replacement CD shall equal the average daily usage <br /> of the individually metered point of delivery or aggregated points of delivery for the sixty(60)month period <br /> ended June 30 of the most recent calendar year available. The Replacement CD will not become effective <br /> until the Initial CD calculation of the individually metered point of delivery or aggregated points of delivery <br /> includes sixty(60)months of measured MMBtu. <br /> (iii) In no instance shall the Initial CD or the Replacement CD be less than 10 MMBtu. <br /> Original Rate Schedule T-90 C Replaces Rate Schedule T-90 Effective 07-11-19 <br />