My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
06-25-20 CenterPoint Schedule of Rates
LaPorte
>
.Ordinances
>
Franchises
>
Gas
>
06-25-20 CenterPoint Schedule of Rates
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/9/2024 10:41:35 PM
Creation date
11/26/2024 9:42:18 AM
Metadata
Fields
Template:
La Porte TX
Document Type
Financial Reports
Date
6/25/2020
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CENTERPOINT ENERGY RESOURCES CORP. <br />DB/A CENTERPOINT ENERGY ENTEX <br />AND CENTERPOINT ENERGY TEXAS GAS <br />GENERAL RULES AND REGULATIONS <br />APPLICABLE TO NATURAL GAS SERVICE IN TEXAS <br />FOR JURISDICTIONS FOR WHICH TARIFF IS APPROVED ON OR AFTER MAY 23, 2017 <br />premises, it shall have the right at any reasonable time thereafter to enter upon the premises and remove <br />therefrom' its meter, and any other of its equipment there located. <br />10. METER TESTS AND BILL ADJUSTMENTS WITH RESPECT TO METER ACCURACY <br />(a) Meter requirements. <br />(1) Use of meter. All gas sold by the Company shall be charged for by meter measurements, <br />except where otherwise provided for by applicable law, regulation of the regulatory <br />authority or tariff. <br />(2) Installation by Company. Unless otherwise authorized by the regulatory authority, the <br />Company shall provide and install and will continue to own and maintain all meters <br />necessary for measurement of gas delivered to its customers. <br />(3) Standard type. The Company shall not furnish, set up; or put in use any meter which is <br />not reliable and of a standard type which meets generally accepted industry standards; <br />provided, however, special meters not necessarily conforming to such standard types may <br />be used for investigation, testing, or experimental purposes. <br />(b) Meter records. The Company shall keep the following records: <br />(1) Meter equipment records. The Company shall keep a record of all its meters, showing <br />the customer's address and date of the last test. <br />(2) Records of meter tests. All meter tests must be properly referenced to the meter record <br />provided for therein. The record of each test made on request of a customer must show <br />the identifying number and constants of the meter, the standard meter and other <br />measuring devices used, the date and kind of test made, by whom made, the error (or <br />percentage of accuracy) at each load tested, and sufficient data to permit verification of <br />all calculations. <br />(c) Meter readings. <br />(1) Meter unit location. In general, each meter must indicate clearly the units of service for <br />which charge is made to the customer. <br />(d) Meter tests on request of customer. <br />(1) The Company shall, upon request of a customer make a test of the accuracy of the meter <br />serving that customer. The Company shall inform the customer of the time and place of <br />the test, and permit the customer or his authorized representative to be present if the <br />customer so desires.. If no such test has been performed within the previous four years <br />for the same customer at the same location, the test shall be performed without charge. If <br />such a test has been performed for the same customer at the same location within the <br />
The URL can be used to link to this page
Your browser does not support the video tag.