My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
06-27-18 CenterPoint - Updated Schedule of Rates
LaPorte
>
.Ordinances
>
Franchises
>
Gas
>
06-27-18 CenterPoint - Updated Schedule of Rates
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/19/2018 8:47:12 AM
Creation date
11/26/2024 9:42:19 AM
Metadata
Fields
Template:
La Porte TX
Document Type
Contracts/Leases/Agreements
Date
6/27/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CENTERPOINT ENERGY RESOURCES CORP. <br /> D/B/A CENTERPOINT ENERGY ENTEX <br /> AND CENTERPOINT ENERGY TEXAS GAS <br /> GENERAL RULES AND REGULATIONS <br /> APPLICABLE TO NATURAL GAS SERVICE IN TEXAS <br /> FOR JURISDICTIONS FOR WHICH TARIFF IS APPROVED ON OR AFTER MAY 23,2017 <br /> customer with a postcard and request that the customer read the meter and return the card to the <br /> utility if the meter is of a type that can be read by the customer without significant inconvenience <br /> or special tools or equipment. If such a postcard is not received by the Company in time for <br /> billing,the Company may estimate the meter reading and render the bill accordingly. <br /> (d) Disputed bills. <br /> (1) In the event of a dispute between the customer and the Company regarding the bill,the <br /> Company shall forthwith make such investigation as is required by the particular case and <br /> report the results thereof to the customer. If the customer wishes to obtain the benefit of <br /> subsection(2)hereunder,notification of the dispute must be given to the Company prior <br /> to the date the bill becomes delinquent. In the event the dispute is not resolved, the <br /> Company shall inform the customer of the complaint procedures of the appropriate <br /> regulatory authority. <br /> (2) Notwithstanding any other provisions of these rules and regulations,the customer shall <br /> not be required to pay the disputed portion of the bill which exceeds the amount of that <br /> customer's average usage for the billing period at current rates until the earlier of the <br /> following: (1)resolution of the dispute;or(2)the expiration of the sixty(60)day period <br /> beginning on the day the disputed bill is issued. For purposes of this section only,the <br /> customer's average usage for the billing period shall be the average of the customer's <br /> usage for the same billing period during the preceding two(2)years. Where no previous <br /> usage history exists,the average usage shall be estimated on the basis of usage levels of <br /> similar customers and under similar conditions. <br /> 21. NEW CONSTRUCTION <br /> (a) Standards of construction. The Company shall construct, install, operate, and maintain its plant, <br /> structures,equipment,and lines in accordance with the provisions of such codes and standards as <br /> are generally accepted by the industry, as modified by rule or regulation of the regulatory <br /> authority,or otherwise by law,and in such manner to best accommodate the public and to prevent <br /> interference with service furnished by other public utilities insofar as practical. <br /> • <br /> (b) Response to request for residential and commercial service. The Company shall serve each <br /> qualified residential and commercial applicant for service within its service area as rapidly as <br /> practical. As a general policy,those applications not involving line extensions or new facilities <br /> should be filled within seven working days. Those applications for individual residential service <br /> requiring line extensions should be filled within ninety days unless unavailability of materials or <br /> other causes beyond the control of the Company result in unavoidable delays. In the event that <br /> residential service is delayed in excess of ninety days after an applicant has met credit <br /> requirements and made satisfactory arrangements for payment of any required construction <br /> charges, a report must be made to the regulatory authority listing the name of the applicant, <br /> location,and cause for delay. Unless such delays are due to causes which are reasonably beyond <br /> the control of the Company,a delay in excess of ninety days may be found to constitute a refusal <br /> to serve. <br />
The URL can be used to link to this page
Your browser does not support the video tag.