My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
01-16-12 Drainage & Flooding Committee Meeting
LaPorte
>
Agenda packets
>
Drainage Committee
>
2012
>
01-16-12 Drainage & Flooding Committee Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2012 4:25:16 PM
Creation date
3/7/2025 1:12:34 PM
Metadata
Fields
Template:
La Porte TX
Document Type
Agenda PACKETS
Date
1/16/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REQUEST FOR DRAINAGE COMMITTEE AGENDA ITEM <br />Appropriation <br />Agenda Date Requested:January 16, 2012 <br />:N/A <br />Source of Funds <br />Julian Garza <br />Requested By: <br />Account Number:N/A <br />Department: Planning <br />Amount Budgeted:N/A <br />Report: _X_Resolution: _ _Ordinance: ___ <br />Amount Requested: N/A <br />Budgeted Item: XYES NO <br />Exhibit: Hydrologic and Hydraulic Study for Taylor <br />Bayou <br />SUMMARY <br />On September 12, 2011, City Council Authorized Civil Tech Engineering, Inc. to proceed with the Taylor <br />Bayou Preliminary Engineering Design Report. The scope of work was defined in tasks to limit the scope <br />as needed. The results of the Hydrologic and Hydraulic study consist of Task 1 through 4 of the <br />Engineering Design Report proposal. These tasks were performed to evaluate the capacity of Taylor <br />Bayou and determine if structural flooding could be reduced by improving conveyance of Taylor Bayou. <br />It was determined that the 10-, 50- and 100-year water surface elevations of Taylor Bayou only cause <br />minor street flooding in the Shady River Subdivision and historical structural flooding in the subdivision <br />is likely caused by coastal storm surges in Galveston Bay. <br />The study did however indicate significant head losses at McCabe Roadand Taylor Bayou and <br />recommends replacement of existing culverts to eliminate the out-of-bank flooding upstream of McCabe <br />Road during extreme events. <br />Due to the status of development in the area this is not an urgent and does not require immediate <br />attention. Therefore, staff will work with Harris County and Harris County Flood Control in an effort to <br />partner on this project. <br />Action Required: <br />Present Taylor Bayou Preliminary Engineering Report findings. <br />Approved for Drainage Committee Agenda <br />___________________________________________________________ <br />Steve Gillett, Interim City Manager Date <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.