Acquisition Consultant on board with formal <br />Existing Open Ditch Roadway with Concrete Curb and Gutter Roadway and place Concrete Boxes - <br />ocument states this site <br />ent View to Pine Bluff, storm sewer on East side of Broadway will be investigated and replaced as <br />two <br />Advertise to let 3/29/15. Bid Opening <br />will be constructed after buyout completed. <br />grading ditch and adjusting or replacing culverts to facilitate drainage to Sens Rd.“P” St. <br />scheduled to arrive 3/26. Abutments construction began on <br />trees w/ a 75% survival rate for 5 yrs. 8 parcels will <br />S to determine ultimate width and depth available across <br />2 lanes each way with a <br />10 yr project, 25% finished in 2 years. <br />Bid to be presented at Council meeting on 4/13 for recommendation of award. <br />maintenance <br />lined channel. <br />pipeline corridor to allow construction of multiple channels in phases to convey ultimate discharge. <br />N. <br />grading ditch and adjusting or replacing culverts to facilitate drainage to <br />TxDOT will provide positive protection for Outfall along Northbound SH 146 Frontage Road <br />Harris Co. Pct. 2 HCFCD has requested the City provide a 20’ <br />- <br />s <br />ottom for erosion control of existing gras <br />d <br />ironmental <br />(March 2015) <br />. <br />being prepared <br />sewer lines. Scheduled for September 2015 letting. <br />open ditch roadway to <br />nv <br />e <br />USACE requires tree monitoring plan as <br />DESCRIPTIONDESCRIPTION <br />etes & bounds <br />- <br />need to be acquired after environmental clearance obtained. <br />oadway. <br />Permit submitted and available to public for comments. <br />ed. USACE allowable <br />. <br />basin <br />e adverse effect in proposed job <br />(March 2015) <br />City detention basins constructed. An additional third <br />r <br />utter <br />lon <br />e <br />two lan <br />galM <br />curb and g <br />. <br />- <br />ADMINISTRATIVE DRAINAGE PROJECTS <br />ditch <br />- <br />excavation N <br />b <br />mitigating. Proposal to plant 400 3 <br />Concrete rip rap side slope and channel <br />Happy Harbor Bulkhead being develop <br />Harris County Project: Reconstruct <br />easement on east side of the existing <br />has been ordered and is <br />oncrete <br />offers ready to be presented. <br />- <br />Harris County Project: Hydro <br />Pipeline corridor may hav <br />c <br />Plans 100% complete. Plans 100% complete. <br />way center turn lane <br />storm <br />--, 2015 <br />DRAINAGE PROJECTS <br />ReSurvey ordered. Re <br />Survey ordered. <br />needed to clear <br />20 <br />and Culverts. <br />March <br />Completed. <br />4/20/15./16/15. <br />Bridge <br />- <br />Widen <br />self <br />c <br />– <br />Cres <br />Bid <br />is <br />3 <br />AT PIPELINE CORRIDOR <br />ontract <br />RAINAGE IMPROVEMENTS <br />PEDESTRIAN BRIDGE AT LAKES AT FAIRMONT <br />WATERSHED IMPROVEMENTS <br />Regional Detention <br />ain <br />Madison St. to 450’ South of W. Main St.) <br />C <br />enance <br />SILTING <br />M <br />airmont to <br />IMPROVEMENTS <br />PROJECT <br />ST. CULVERT REPLACEMENT <br />“D” ST. CHANNEL PROTECTION <br />-Maint <br />SENS ROAD RECONSTRUCTION <br />ETENTION BASINS <br />PROJECT <br />‘D’ ST. TO SENS RD. DITCH DE <br />F <br />- <br />From <br />F216 <br />DRAINAGE CHANNEL <br />emote <br />‘D’ ST. ULTIMATE OUTFALL <br />St to <br />BROWNING/GOLDEN D <br />– <br />R <br />‘D’ ST. CHANNEL <br />ST. PROJECT <br />TxDOT/BROADWAY <br />th <br />MS4 PERMIT <br />– <br />F216 PHASE II of 16 <br />BROOKGLEN D <br />LP Bulkhead <br />GREENS <br />From east <br />‘P’ <br />RD <br />F101 <br />W. <br />3W. W. <br />N. N. <br />S. <br />(C <br />NO. <br />1AAA <br />NO. <br />23 <br />01112 <br />123456789 <br />1 <br /> <br />