Laserfiche WebLink
trees w/ a 75% survival rate for 5 yrs. 8 parcels will need to be acquired after environmental clearance obtained.nvironmental sewer S to determine ultimate width and depth available <br /> across corridor to allow construction of Grant <br /> <br />ulverts. Storm Sewer <br />mitigating. Proposal <br />Project Proposal Exhibit 4A.oncrete <br />recorded, awaiting acceptance from HCFCD. Job will be let as soon as formal acceptance from HCFCD <br />e <br /> <br />th <br />maintenance easement on east side of the <br />Pipeline corridor may hav <br />Commissioners Court to approve <br />as well as Main Street from 146 to 6 <br />Klotz Associates submitted a draft project scope to identify future drainage needs and potential Community Development Block <br />storm <br /> <br />in March 2015. <br /> <br />c <br />Letter sent to DOJ. <br /> <br />) <br />ent View to Pine Bluff, storm sewer on East side of Broadway will be investigated and replaced as needed to clear <br />with a center turn lane <br />onitoring. USACE e <br />- <br /> <br />self <br />boxes and c <br />lined channel. Completed <br />ocument states this site is <br /> <br /> <br /> <br />will be constructed after buyout completed. <br />grading ditch and adjusting or replacing culverts to facilitate drainage to Sens Rd. <br /> <br />25% finished in 2 years. <br />for tree m <br /> <br /> <br />each direction <br />oncrete <br />N. <br />Initial contract estimates required. <br />grading ditch and adjusting or replacing culverts to facilitate drainage to <br /> <br />th <br /> <br /> <br />Contract signed <br />awarded at $139,000 to Paskey Construction. Notice to Proceed given May 25, 2015. <br /> <br />, and 18 <br />roadway and place c. <br />oad <br />orthbound SH 146 frontage r <br />-4 lanes (2 lanes <br />s <br /> <br />th <br />ottom for erosion control of existing gras <br />Excavation. <br />, 17 <br /> <br />d <br /> 2015) <br />ironmental <br /> <br />th <br />DESCRIPTIONDESCRIPTION <br />include an examination of drainage infrastructure needs near Polk, North 16 <br /> <br />10 yr project, <br /> <br />onsultant on board with formal offers ready to be presented. <br />- <br />utter <br />allocation of additional monies to Landev Engineering to begin Hydro <br />open ditch roadway to <br />nv <br />JUNE <br /> <br />e <br />USACE requires tree monitoring plan as <br /> <br />g <br />urb & <br />2015) <br />- <br />Happy Harbor Bulkhead being developed. USACE allowable <br /> <br /> <br />basin <br />ultimate discharge. <br />( <br /> <br />c <br />rovide positive protection for outfall along n <br />oncrete <br />ADMINISTRATIVE DRAINAGE PROJECTS <br /> <br /> <br />City detention basins constructed. An additional third <br />JUNE <br /> <br />isting open ditch roadway with c <br /> <br />lines. Scheduled for September 2015 letting. <br />-e <br />Harris County Project: Reconstruct two lan <br />excavation N <br />b <br />( <br />Concrete rip rap side slope and channel <br /> <br />multiple channels in phases to convey <br />DRAINAGE PROJECTS <br /> <br />. <br /> <br />- <br />adverse effect in proposed job <br />- <br />CDBG <br />Harris County Project: Hydro <br />Easement <br />(CDBG) projects in the <br />Plans 100% complete. Plans 100% complete. <br /> <br />learance anticipated. <br /> <br />-- <br />lon <br />Survey ordered. ReSurvey ordered. Re <br />gal <br /> <br />Reconstruct ex <br />- <br />. <br />to plant 400 3 <br />ditch <br />TxDOT will p <br />Acquisition c <br /> <br />received. <br /> <br />existing <br />c <br />Cres <br />Bid <br />c <br /> TxDOT/BROADWAY Remote Maintenance Contract <br />RAINAGE IMPROVEMENTS <br /> <br /> <br /> <br />WATERSHED IMPROVEMENTS <br />Regional Detention <br /> <br /> <br />From Fairmont to Main <br /> <br />AT PIPELINE <br />SILTING <br /> <br /> <br /> <br /> <br />- <br />BROOKGLEN DETENTION BASINS <br /> <br /> <br />SENS ROAD RECONSTRUCTION <br />PROJECTPROJECT <br /> <br /> <br />- <br />F216 <br />F101 DRAINAGE CHANNEL <br />ULTIMATE OUTFALL <br />St to <br />BROWNING/GOLDEN D <br /> <br /> <br />ST. PROJECT <br />NORTH SIDE STUDY <br /> <br /> th <br />of 16 <br />F216 PHASE II <br /> <br />LP Bulkhead <br /> <br /> <br />CORRIDOR <br />From east <br /> <br />RD <br />W. <br />W. W. <br />3 <br />N. N. <br />S. <br />(C <br />NO. NO. <br /> <br />111213 <br />0 <br />1A <br />123456789 <br />1 <br /> <br />