My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
06-11-18 Drainage and Flooding Committee Meeting
LaPorte
>
City Secretary
>
Agenda packets 2010 to current
>
Agenda packets 2010 to current
>
Drainage Committee
>
2018
>
06-11-18 Drainage and Flooding Committee Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2025 1:32:00 PM
Creation date
3/7/2025 1:12:42 PM
Metadata
Fields
Template:
City Meetings
Meeting Body
Drainage and Flooding Committee
Meeting Doc Type
Agenda Packet
Date
6/11/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
W. D Street Channel Protection <br />City Engineer/Inspection Service Manager Bob Eng provided an update on the W. D Street Channel <br />Protection Project. There were no questions from Committee Members. <br />F101 Drainage Channel (at Pipeline Corridor) <br />City Engineer/Inspection Service Manager Bob Eng provided an update on the F101 Drainage Channel <br />(at Pipeline Corridor) Project. There were no questions from Committee Members. <br />Brookglen Detention Basins <br />City Engineer/Inspection Service Manager Bob Eng provided an update on the Brookglen Detention <br />Basins Project. There were no questions from Committee Members. <br />Sens Road Reconstruction <br />City Engineer/Inspection Service Manager Bob Eng provided an update on the Sens Road <br />Reconstruction. There were no questions from Committee Members. <br />Pedestrian Bridge at Lakes at Fairmont Greens <br />City Engineer/Inspection Service Manager Bob Eng provided an update on the Pedestrian Bridge at <br />Lakes at Fairmont Greens Project. There were no questions from Committee Members. <br />MS4 Permit <br />City Engineer/Inspection Service Manager Bob Eng provided an update on the MS4 Permit. There were <br />no questions from Committee Members. <br />(b) Discussion of Drainage Concerns in the City of La Porte — B. Eng <br />Committee member Leonard commented during the recent rain events he noticed considerable <br />retention of water in the ditches on Fairmont Parkway and asked if Harris County Flood Control District <br />has plans on repairing elevation for better drainage. Mr. Eng responded he will contact Harris County <br />Flood Control District and inquire about the drainage concern. In addition, Mr. Eng advised if water <br />remains more than seventy-two hours, Harris County Flood Control District will consider it to be a <br />problem. Public Works Director Dave Mick advised Harris County Flood Control District has been <br />contacted to work various ditches on County roads; work has been performed on S. 161h Street for a <br />number of weeks; and work is complete on N. 111h and N. 121h Streets. In addition, Mr. Mick advised a <br />prioritized list of projects for ditches will be sent to the County as per their request. <br />Vice -Chairman Martin asked if rainfall can be measured around the City of La Porte. Planning and <br />Development Director Tim Tietjens responded yes, there is a website for Harris County with <br />transducers that measures rainfall on fifteen minute increments. Vice Chairman Martin asked if there <br />are any other major projects need to be continued in the City of La Porte after the S. 31d Street Project. <br />Planning and Development Director Tim Tietjens responded yes, F216 Phase II and F101. <br />Alternate Member Earp requested the F216 Phase II and F101 Projects remain priority and to have <br />Harris County Flood Control District provide some type of relief for drainage in Lomax. <br />Page 3 of 4 <br />June 29, 2015 <br />Drainage and Flooding Committee Minutes <br />
The URL can be used to link to this page
Your browser does not support the video tag.