Laserfiche WebLink
REQUEST FOR DRAINAGE COMMITTEE AGENDA ITEM <br />Agenda Date Requested: June 11, 2018 <br />Requested By: L. Wingate/D. Pennell <br />Department: Public Works <br />Report: �*, Resolution: C-Ordinance: C- <br />Exhibits : <br />Appropriation <br />Source of Funds: <br />Account Number: <br />Amount Budgeted: <br />Amount Requested: <br />Budgeted Item: 4, YES C-NO <br />SUMMARY <br />Approximately 800 linear feet of RCP pipe, ranging in size from 15" to 24", exists within the Bayside Terrance <br />Subdivision, which has not been properly maintained due to access issues attributed to limited access to <br />infrastructure, provided within a five foot utility easement. Portions of Hamilton Street and Fondren Street utilize <br />this system to convey stormwater to its outfall point of Galveston Bay. The system fails to function properly, <br />causing flooding within the adjacent portion(s) of the subdivision. A proposed drainage study would discuss <br />feasibility of rerouting this flows from the 800 feet of RCP, towards Bayside Dr. and utilizing the existing system <br />within Bayside Dr. to convey the storm water within the existing system. <br />Action Re quire d: <br />Approved for Drainage Committee Agenda <br />Corby D. Alexander, City Manager Date <br />