January 29, 2020 <br />Mr. Lorenzo Wingate <br />City Engineer <br />rd <br />2963 N. 23Street <br />La Porte, TX 77571 <br />RE: Engineering Services Fee Proposal <br />Bayside Terrace Subdivision Drainage Improvements <br />Revision 3 <br />Dear Mr. Wingate: <br />Halff AssociatesInc. (Halff)is pleased to submit our proposal to provide engineering servicesfor the <br />Bayside Terrace Subdivision Drainage Improvements projectfor the City of La Porte.The purpose of the <br />project is to increase capacity and address existing flooding issues within the subdivision by regrading <br />roadside ditches and upsizing the existing storm sewer system. The project area is generally bounded by <br />Pine Bluff Drive to the north, S. Broadway Street to the west, Dwire Drive to the south, and the San <br />Jacinto Bay to the east. This proposal will address development ofa preliminary engineering report <br />(PER), final design plans, and construction phase services.Additional services include geotechnical <br />analysis and environmental analysis. <br />In the PER, Halff will analyze existing conditions and evaluate proposed alternatives to recommend the <br />most feasible design based on various factors including estimated construction cost, available right-of- <br />way and easements, constructability, conflicts with existing utilities, and inconvenience to residents. <br />Alternatives will be presented to the City of La Porte for determination and approval of the final design. <br />The purpose of the finaldesign phase is to develop signed and sealed construction plansbased upon <br />findings in the PER. <br />Existing Conditions: <br />There are approximately 227 total structures within the “At-Risk” project area, including 206 residential <br />homes and 21 commercial structures.All 227 structures exist within a FEMA designated Special Flood <br />Hazard Area. Approximately 17 structures were damaged from Hurricane Harvey in 2017, resulting in <br />over $1.1 million dollars in damages. <br />The existing stormwater collection system is comprised of roadside ditches and underground reinforced <br />box culvert storm sewer to convey flow to two outfall points: an underground collection system along <br />Bayside Drive at the center of the subdivision, and a secondary collection system running along the <br />southeasternboundary of the subdivision.Both outfalls terminate at San Jacinto Bay. Access to the <br />southeastern collection system is limited; the system is located within fenced-in backyards of properties <br />within the subdivision and does not exist within a utility easement nor public right-of-way. <br />During intense rainfall events, the capacity of the southern system is exceeded,and the backwater <br />condition inundates sections of the neighborhood upstream. <br /> <br />