Laserfiche WebLink
The City of La Porte Drainage Projects 2019 <br />N <br />NUM BER PROJECT <br />1 Brookglen Flooding Mitigation Analysis <br />2 Bayside Terrace Drainage Improvements <br />3 Lomax/F101-03-00 Drainage Channel Feasibility Study <br />4 Little Cedar Bayou F216 Phase III Improvement <br />5 6th Street Madison to Main Paving and Drainage <br />6 8th & D Storm Water Conveyance Improvements <br />7 Bob's Gully <br />8 Little Cedar Bayou F216 Phase II Improvements <br />9 Coupland Drive <br />10 Airport On-site Drainage Improvements <br />R6 <br />0 0.5 1 2 Miles <br />�mm <br />