Laserfiche WebLink
PROBLEM AREA:N +6 <br />Possible Flood Damage <br />Reduction Projects <br />Alternative D <br />(Recommended) <br />Channel Improvement + Box <br />Culvert Replacement <br />Channel Improvement: <br />N Broadway St to N Utah St <br />Deepening, 4:1 side slope <br />Box Culvert Replacement: <br />N Utah St to East E St <br />ItemCost <br />Construction$3,433,100 <br />culvert <br />ROW$150,000 <br />Engr. Design$755,400 <br />5 <br />Total$4,339,000 <br /> <br />