My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
10-11-21
LaPorte
>
Agenda packets
>
Drainage Committee
>
2021
>
10-11-21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2023 9:39:41 AM
Creation date
3/7/2025 1:13:02 PM
Metadata
Fields
Template:
City Meetings
Meeting Body
Drainage and Flooding Committee
Meeting Doc Type
Agenda Packet
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Mr. Lorenzo Wingate <br />City of La Porte <br />August 31, 2021 <br /> <br />Page 9 <br />borings, conversion of the soil borings into temporary groundwater screening points, and the <br />collection and laboratory analysis of soil and groundwater samples. <br />Task 10: Subsurface Utility Engineering <br />Depending on the final location of the detention pond, the pond outfall may cross above or below the <br />existing 30Ñ Spectra natural gas pipeline. In order to avoid a utility conflict, one (1) quality-level A <br />pothole is scoped to identify the depth of the pipeline. <br /> <br />Task 11: Construction Staking <br /> <br />Construction staking services will be performed by Amani Engineering. Amani will recover and reset <br />survey controls delineated in the design phase. This effort does not include staking out the pond <br />boundary. Halff will provide design CADD files to the contractor for reference. <br /> <br />Services Not Included: <br /> <br /> Tier II Water Quality Certification <br /> NEPA Documentation <br /> Construction staking of pond limits including top of bank and toe <br /> <br />List of Assumptions: <br /> <br />1. All consultant fees shown on are considered to be time and materials, unless otherwise noted. <br />2. The City of La Porte will provide any procedures, policies, data collection systems, engineering <br />guidelines, standards, and design criteria that will be required for this project. <br />3. The City of La Porte will retain ownership of any deliverables and electronic files created for this <br />project but will not be supplied with software applications or licenses as part of this project. <br />4. The scope of services does not include any preparation or attendance at any public meetings <br />pertaining to the project design or construction. <br />5. The City of La Porte will prepare the project manual and front end documents for this project. <br />Halff will prepare the bid form, specifications, general provisions, and special specifications. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.