My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
2-13-23
LaPorte
>
City Secretary
>
Agenda packets 2010 to current
>
Agenda packets 2010 to current
>
Drainage Committee
>
2023
>
2-13-23
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/26/2023 5:28:17 PM
Creation date
3/7/2025 1:13:12 PM
Metadata
Fields
Template:
City Meetings
Meeting Body
Drainage and Flooding Committee
Meeting Doc Type
Agenda Packet
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
January 6, 2023 <br />Andrew Moore, P.E. <br />Halff Associates, Inc. <br />Page 2 <br />Project Summary <br />The City of Pasadena is proposing to develop a detention pond in order to satisfy an interlocal <br />agreement between the City of Pasadena and the City of La Porte. The agreement between the <br />cities involved the City of La Porte receiving a 99-acre tract from the City of Pasadena in exchange <br />for a 73-acre tract. The City of Pasadena proposed drainage improvements within the 99-acre <br />tract as a part of a planned redevelopment of the Pasadena Convention Center and Fairgrounds <br />site, including the construction of a detention pond with a minimum of 100-acre feet of volume, as <br />well as relocation of several driveways. <br />capacity provisions. The tract is mostly undeveloped and consists of grassy terrain. The <br />proposed project, consisting of a single pond located along the southern portion of the tract, <br />overlaps approximately 6.9 acres of potentially jurisdictional forested wetlands. The goal of the <br />hydrologic and hydraulic analysis was to show no adverse impact on the existing floodplain as a <br />result of the proposed detention pond. <br />Detention Summary <br />The following table identifies the detention summary provided within the report: <br /> <br />Floodplain Related Information <br />According to FEMA FIRM Panel No. 48201C0940M, effective June 9, 2014, majority of the 100- <br />year floodplain (Zone AE) to be contained within the channel except for small portions that extend <br />over the west and east overbanks near the downstream side of the project area. The 500-year <br />floodplain (Shaded Zone X) covers approximately half of the project area and generally coincides <br />with the potentially jurisdictional wetlands submitted under an AJD to the USACE for evaluation. <br />Work in the effective FEMA floodway is not proposed in this project. <br />Please also note that the City of Pasadena is the Floodplain Administrator for the receiving <br />waterways. All issues regarding local floodplain regulations must be coordinated through <br />the City of Pasadena. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.