My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
07-08-13 Meeting of the La Porte Development Corporation Board of Directors
LaPorte
>
Agenda packets
>
La Porte Development Corporation/4B
>
2013
>
07-08-13 Meeting of the La Porte Development Corporation Board of Directors
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/6/2020 10:49:23 AM
Creation date
3/7/2025 1:17:01 PM
Metadata
Fields
Template:
La Porte TX
Document Type
Agenda PACKETS
Date
7/8/2013
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
May 10, 2013 <br />Mr. Rob Johnson <br />Rob Johnson Interests <br />5 Riverway Suite 340 <br />Houston, Texas 77056 <br />Phone: 713-957-2552 <br />NCM Ctemohtlon and P.em�-diatior, LP <br />15,121 Akjin(:Wc IF�Ad Road <br />Houst,,n TX 770Z,2-1311 <br />1 2811449L9711 <br />F 261.d 1`' 6040 <br />a.ncznrlr�„u4�.com <br />SUBJECT: Demolition Proposal - Spencer Hwy at Hwy 146, La Porte, Texas <br />NCM Proposal No: 13-05-41 <br />Dear Mr. Johnson: <br />NCM Demolition and Remediation, LP is pleased to submit a proposal for the following: <br />1. SCOPE OF WORK: <br />Contractor Resan®nnsiblle For: <br />Remove and dispose of up to 125,000 square feet of concrete and asphalt from the <br />above referenced project. <br />Clarifications: 1) <br />NCM assumes there is no asbestos containing materials. Any <br />asbestos containing material encountered may be addressed <br />before work begins. <br />2) <br />NCM will use the trucking company and disposal site of our <br />choice for demolition and construction debris. City waste <br />hauling franchise fees and/or taxes are not included in this <br />pricing. <br />3) <br />Voids in the ground are created by the demolition process will be <br />backfilled with on-site materials. The site will be left in a <br />uniform condition, which is near the original contours with <br />existing materials. Cost of any imports, exports, rough grading or <br />compaction is not included. <br />4) <br />All pavement sections for this project were assumed to be no <br />more than 4" thick and the building slabs were assumed to be no <br />more than 8" thick for the purpose of calculating the volume of <br />debris. <br />5) <br />Dump fees are based on current rates as of the date of this <br />proposal. <br />II. PROCEDURES: Contractor is a certified demolition contractor in Texas as NCM <br />Demolition and Remediation, LP License 9800879. All local, state and federal EPA and <br />
The URL can be used to link to this page
Your browser does not support the video tag.