Laserfiche WebLink
a) Removal of existing metal fascia on the entire perimeter of the building <br />b) Installation of new framework and new stucco fascia panels <br />c) Removal of awning from the southwest side of the building <br />d) Installation of knee -wall stone fascia <br />e) Installation of black wrought iron fence <br />f) Addition of paint and signage to the new structures <br />g) Removal of the block wall between the existing build and Little Jacks to increase <br />square footage of hardware store by 15,000 square feet <br />h) Addition of new interior fixtures and lumber fixtures for expansion <br />i) Addition of new interior signage and fixtures <br />j) Repainting of the pole sign and addition of new graphic signage <br />k) Resealing and restriping the parking lot <br />1) Repaving of area which is currently covered on the south side of the building <br />m) Addition of new flower beds and landscaping, including a block flower bed at the <br />bottom of the exterior sign pole and add stucco finish to match the building <br />11 <br />