My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
10-24-16 Meeting of the La Porte Development Corporation Board of Directors
LaPorte
>
Agenda Packets
>
La Porte Development Corporation/4B
>
2016
>
10-24-16 Meeting of the La Porte Development Corporation Board of Directors
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/19/2016 11:33:08 AM
Creation date
3/7/2025 1:18:59 PM
Metadata
Fields
Template:
La Porte TX
Document Type
Agenda PACKETS
Date
10/24/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REQUEST FOR LA PORTE DEVELOPMENT CORPORATION AGENDA ITEM <br />Budget <br />Agenda Date Requested: October 24 2016 <br />Source of Funds: CIP #015-9892-993 <br />Requested By: Traci Leach <br />Account Number: <br />Department: Administration/Economic Development <br />Amount Budgeted: $222,105.48 <br />Report: Resolution: Ordinance: <br />Amount Requested: $25,000.00 <br />Exhibit: Project Application and Quotes <br />Budgeted Item: YES NO <br />Exhibit: Development Agreement – Signed <br />Exhibit: Project Worksheet <br />SUMMARY & RECOMMENDATION <br />Staff reviewed an Enhancement Grant Application from Patrasia Hefley, new owner of property <br />located at 832 S. Broadway in La Porte, Texas. The applicant collected bids from general <br />contractors to complete several projects to completely rehabilitate the exterior of the building. The <br />proposed project is as follows: <br />a.Replacement of door, fascia boards, windows, and gutters $12,250.00 <br />b.Build decorative wall on top of building $17,420.00 <br />c.Re-asphalt the parking lot $11,800.00 <br />d.Installation of new exterior lighting $ 1,500.00 <br />e.Painting exterior walls $ 1,775.00 <br />f.Remove old eaves and build new eave at $15,915.00 <br />front and side door <br />g.Repair flower terraces $ 1,375.00 <br />h.Sales Tax $ 5,117.89 <br /> Total $67,152.89 <br />As a result of the lowest bid for the project, the total expenditure proposed to be made by the <br />applicant is estimated to be $67,152.89. Fifty percent of this sum is $33,576.44. However, in the <br />interest of expediency, the applicant has requested that the reimbursable amount be lowered to <br />$25,000. The development agreement associated with this project is slightly different from <br />previous ones. The property is currently vacant and, as such, there are no jobs currently retained <br />at this location. However, Ms. Hefley desires to complete repairs on the building to lease it to a <br />future tenant, who would bring new jobs to La Porte. <br />The proposed development agreement provides for two separate payments. The first <br />reimbursement (80%) would occur after the proposed improvements have been completed and <br />verified by the Board with receipts and photos.The applicant has 18 months to complete the <br />improvements. The second reimbursement payment (20%) would occur after the applicant <br />provides proof of a lease that is bringing jobs. The applicant has eighteen months to provide <br />documentation of a valid lease. <br />In the Budget block at the top of the page, $221,105.48 represents the amount of uncommitted <br />funds in the enhancement grant account and includes commitment of $7,559.73 for The Gates. <br />16 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.