Laserfiche WebLink
44JM Y 1 �r7P9;$s 4tWd A�, `.... .......... <br />Barbours Cut Direct Connectors <br />Ttt t to t <br />p g ge Il forpmjectsn September2017 <br />.DOT orkng thT a,AR,MT.m,portaton lnsttuteto <br />study Ongm/Destinations between the Barbour', Cut Terminal and <br />the SH 146/SH 225 interchange to determine the impacts of a direct <br />e�tor <br />2 SH-146Widening-Spencer Highwayto Port Road <br />•T,DOTI,currentlypreparingdetailed design plans fortheproject <br />• Anticipated letting for construction in Fy 2023 scheduled for 2018 <br />3 SH -225 expan,ionf—p—m-t(8-East 146) <br />• Tx DOT is working on a feasibility t.dy for SH 225 from 1-610 to <br />SH 146. completion Q3 2018 <br />4 Broadway Double Tack Project <br />5 Gand Parkway NE Segments <br />6 FM -1942 from Hatcherville Road to SH -146— road improvement <br />7 Hatcherville Rd from FM -1942 to Liberty/Chambers Co.Line—road widening <br />•No improvements are currently planned <br />8 FM 565 from SH -146 to SH -99— widening a nd addition of tuming lanes <br />• Project from FM 1409 to SH 99: Reconstruct a nd realign roadway <br />I, anticipated to le[ for construction in FV 2018 <br />9 BW -8 Direct Connectors @ SH -225: Westbound on 225 to 8 N, Northbound on <br />• TxDOT is working with the Harris County Tollroad Authority to <br />8 to E/W 225, Eastbound on 225 to 8S <br />H/M advance the construct on of an mterchange <br />SH146 from 110 to Business 146 (Alexander Drive) <br />''. The grade sI,parat on/freeway starts at Alexander and —fir,— all <br />'.. the way to Red Bluff. There pmbably needs to be some work on <br />SH146 North of 110 through Mont Belvieu also <br />10 Penn City Connector <br />_H/M.I <br />11 Barbours Cut Blvd exp—i-o to 6lanes <br />H/M Nod ,cuss ons yet of who champions this effort <br />12 SH -225 expan, ocf—p—m-t (8 -Wert 610) <br />H/M.... <br />13 1-69 Bypass <br />• T%DOT s procuring a &,Ign —build contract for SH 99 Seg. H and I <br />'.. From 1-69 to SH 146which would make up the northern section of <br />'.. ..1-69Bypass with cond t onal award anticipated Spring 2017 <br />• Southern Section of an 1-69 Bypass s be ng discussed through H- <br />H/M_.'GAC <br />14 Fairmont Parkway (Turn ng improvements) <br />H/M County and La Porte funded through Tx DOT Gant <br />15 SH -225 and 1-6101ntemhange <br />• TxDOT is working with H -GAC to begin a feasibility study for SH <br />H/L <br />225 from 1-610 to SH 146 <br />16 1-610 bridge at HSC <br />• Additional meetings with the Economic Alliance are requested to <br />H/L <br />identify the needs and project scope at this to cation <br />17 Fairmont Parkway(Widening) <br />H/L <br />18 Port Road Phase 3 & Dainage <br />County roadway / POHA Drainage <br />19 SH-330(impmvenorthboundconnectivityto1-10-21ane,ordirectconnect) <br />•TxDOTha,prepodthe Preliminary Engineering and <br />Environmental for additional ramp access to 1-10 and is working to <br />ons ruction funding <br />20 Independence Parkway (improve Northbound connectivity to SH -225) <br />• Additional meetings with the Economic Alliance are requested to <br />identify, the needs and pmject scope at this location <br />21 Spencer Highway Bridge (Bayport Ra Mainline) <br />M/L <br />22 Bayport Mainline Rail Tack <br />MA <br />23 Sheldon Road expansion <br />MA <br />24 Apples Road (Sheldon to Market) <br />MA <br />1 <br />25 Jacintoport Road Improvement <br />L/L <br />26 Jacintoport Direct Connectors <br />L/L <br />27 Haden Rd (extension to Penn City Rd) <br />L/L <br />Yri06TPmjects shade€. <br />Harris County Projects <br />Direct Connect makes it a Tx DOT/HCFRA discussion <br />County roadway/POHA <br />H - HIGH Priority / S - SHORT Term O -S yrs <br />M - MEDIUM Priority / M- MOT— 5-SOyr, <br />L - LOW Prionty / L - LONG Term 10+yrs <br />jr <br />I����,�u�1u�,wu�1vi10 d�m�IlViluRumu:� <br />