My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
09-23-19 Regular Meeting of the La Porte Development Corporation Board
LaPorte
>
Agenda packets
>
La Porte Development Corporation/4B
>
2019
>
09-23-19 Regular Meeting of the La Porte Development Corporation Board
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/30/2019 5:25:45 PM
Creation date
3/7/2025 1:19:40 PM
Metadata
Fields
Template:
City Meetings
Meeting Body
La Porte Development Board Corporation/Type B
Meeting Doc Type
Agenda
Date
9/23/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />BUSINESS. BY THE BAY. <br /> <br />4. The application will undergo an approval process, which includes but is not <br />limited to the following: <br /> <br />a. Each project must meet current building standards and codes, as well as <br />building permit requirements. <br /> <br />b. The LPDC will only consider applications that have been properly and fully <br />completed, and which contain all information requested in the application <br />and/or by the committee. <br /> <br />c. All itemized work estimates submitted by the Applicant must be dated no <br />earlier than ninety (90) days prior to the Application request. Bids shall be <br />submitted on the contracs or project architecs letterhead and shall <br />contain the contracs name, address, and telephone number and shall <br />itemize the bid in a manner that allows the LPDC to determine the bid <br />components and authenticity of the bid. <br /> <br />d. Applications receiving approval by the LPDC shall commence construction <br />described in the application within ninety (90) days from the date that the <br />enhancement grant is approved. Each Applicant must complete the <br />construction described in the Application within one (1) year from the date that <br />the grant is approved. If the Applicant cannot meet this timeline, then the <br />Applicant may submit a written request for an extension of the commencement <br />date or completion date provided the extension request is made prior to the <br />ninety (90) day or one (1) year time limit. The LPDC shall not be obligated to <br />grant an extension, but it may do so for good cause determined solely by the <br />members of the Committee. The extensions, if granted, shall be for the term <br />and for the conditions determined exclusively by the LPDC. Denial of an <br />extension request may not be appealed. <br /> <br />e. As a condition of this grant Application, the Applicant consents, and shall <br />allow, the LPDC to request city inspections to determine that the grant, if <br />awarded, will not be used for construction on any building that is not in <br />compliance with the City Municipal Codes and Ordinances that are applicable <br />to the construction contemplated in the application. <br /> <br />f. The LPDC shall have sole discretion in awarding grants. They shall award <br />grants considering the amount requested, grant funds available, the guidelines <br />of the grant program, condition of the building in which the grant funds will be <br />used, economic impact, other grant requests, the type and nature of the <br />construction, and the proposed construction results considering the grant <br />program. <br /> <br />g. No Applicant has a proprietary right to receive grant funds. The LPDC shall <br /> <br />LA PORTE ENHANCEMENT GRANT PROGRAM <br />PAGE 5, Revised 12/18/17 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.