Laserfiche WebLink
Exhibit B ' <br /> The TIRZ Improvements <br /> TOTAL TOTAL COSTS INCURRED <br /> ORIGINAL REIMBURSABLE ESTIMATED TO DATE AND ESTIMATED <br /> ESTIMATED COSTS INCURRED ADDITIONAL COSTS ADDITIONAL COST TO <br /> DESCRIPTION COSTS TO DATE TO COMPLETION COMPLETION <br /> CAPITAL IMPROVEMENT BUDGET DESCRIPTION AND ESTIMATED COSTS <br /> Streets with Storm Systems ' <br /> Powell Road(100'ROW) $1,795,000 <br /> Powell Road(60'ROW) $841,000 <br /> Abandon Powell Road ' <br /> Wharton Weems Boulevard $968,000 <br /> McCabe Road $225,000 <br /> SUBTOTAL $3,829,000 $3,560,057 $3,560,057 ' <br /> Water Distribution System <br /> 12"Public Mains $320,000 $522,105 <br /> 8"Public Mains(where 12"not required) $1,077,808 <br /> Offsite Segment Crossing SH 146(12') $351,000 <br /> SUBTOTAL $671,000 $383,756 $11599,913 $1,983,669 ' <br /> Sanitary Sewer System <br /> Lift Station/Force Main $137,000 $80,000 ' <br /> Public Mains 8"-12" $308,000 $158,400 <br /> Offsite Public Mains $66,000 <br /> SUBTOTAL $511,000 $955,573 $238,400 $1,193,973 <br /> Drainage Protects <br /> Stormwater Detention/Drainage <br /> -Acquisition of 32 Acres $2,300,000 <br /> -Construction:Excavation $1,360,000 <br /> -Construction:Storm Sewer $1,232,000 $30,000 <br /> SUBTOTAL $4,892,000 $4,172,747 $30,000 $4,202,747 <br /> Sidewalks , <br /> Sidewalks/Pedestrial Trails along Major Roadways/Drainageways $120,000 $45,448 $45,448 <br /> Landscaping <br /> Along Major Roadways $300,000 $660,042 $ZS01000 $910,042 <br /> Clearing <br /> Public ROW and Easements $120,000 $182,001 $182,001 <br /> Engineering $1,303,000 $834,432 $317,747 $1,152,179 t <br /> 10%ContinaenN $243,606 $243,606 <br /> Developer Interest $1,370,413 TBD $1,370,413 <br /> TOTAL $11,746,000 $12,164,469 <br /> $2,679,666 $14,844,135 ' <br />