Laserfiche WebLink
TASK ORDER NO. 2 <br /> <br />October 24, 2022 <br /> <br />Mr. David Hawes <br />TIRZ 1 <br />Administrator <br />9600 Long Point Road, Suite 200 <br />Houston, TX 77055 <br /> <br />Re: Proposal for Design and Bid Phase Services M Street Improvement Project <br /> <br />Dear Mr. Hawes, <br /> <br />Gauge Engineering, LLC (Gauge) is pleased to submit this proposal for providing design and bid phase services for the M <br />Street Improvement Project. The effort includes the following items: <br /> <br />I. Drainage Impact Study $31,250.00 <br />II. Base Design Phase (90% and Final) $112,535.00 <br />III. Bid Phase $6,420.00 <br />IV. Subcontracted/Misc/Expenses $67,455.50 <br />$217,660.50 <br /> <br />We propose to perform this work for a Lump Sum amount of $233,721.50. A detailed breakdown of the scope items and fee <br />can be found under the attached exhibits. Please feel free to contact me at (713) 254-5946 if you have any questions or <br />need additional information. <br /> <br />Sincerely, Accepted For <br /> La Porte TIRZ <br /> <br /> <br /> <br />Muhammad Ali, P.E. <br />Principal Signature Date <br /> <br /> <br /> <br /> Print <br /> <br />Attachments: Exhibit A Level-of-Effort <br />Exhibit B Survey <br />11750 Katy Freeway, Suite 400 Houston, Texas 77079 832.318.8800 <br /> <br />