Laserfiche WebLink
III. BID PHASE <br />PROF GRAD SR. DESIGN TOTAL LABOR <br />DESCRIPTION OF WORK TASKS PROJ MGRADMIN ASST <br />ENGINEERENGINEERTECHHOURSCOSTS <br />F.Bid Phase <br />1Prepare Advertisement for Bid Document1225$700.00 <br />2Conduct Pre-bid Conference Meeting1269$1,140.00 <br />3Prepare Necessary Addenda to Address Issues or Clarifications14813$1,660.00 <br />4Conduct Bid Opening Meeting & Tabulation of Bids1247$920.00 <br />5Evaluate the Bid Proposals & Make Award Recommendation1449$1,220.00 <br />6Assist in preparation of Contract b/w TIRZ & Successful Bidder145$780.00 <br />Total 618240048$6,420.00 <br />TOTAL HOURS618240048 <br />Contract Labor Rate$180.00$150.00$110.00$120.00$65.00 <br />TOTAL LABOR COSTS BASIC ENGINEERING SERVICES$1,080.00$2,700.00$2,640.00$0.00$0.00$6,420.00 <br />IV. SUBCONTRACTED/MISC/EXPENSES <br />DESCRIPTION OF WORK TASKS COSTSUB MGMT TOTAL <br />Topo Survey (Plan & Profile) - Kuo & Associates (Ex. B)10%$23,820.50 <br />1$21,655.00 <br />Environmental (Phase 1 ESA) - Cypress Environmental <br />2$3,900.0010%$4,290.00 <br />Geotechnical Investigation10%$22,000.00 <br />3$20,000.00 <br />4Structural design (Junction boxes) - SSH, Inc. <br />$10,000.0010%$11,000.00 <br />Value Engineering - Additional work above/beyond previous task order$5,345.00 <br />5 <br />Printing and Reproduction/Mileage/Deliveries$1,000.00 <br />6 <br />TOTAL SUBCONTRACTED ENGINEERING SERVICES$67,455.50 <br />SUMMARY <br />GRAND TOTAL - BASE DESIGN <br />I. DRAINAGE IMPACT STUDY <br />$31,250.00 <br />II. BASE DESIGN PHASE (90% and Final) <br />$112,535.00 <br />III. BID PHASE <br />$6,420.00 <br />IV. SUBCONTRACTED/MISC/EXPENSES <br />$67,455.50 <br />$217,660.50 <br />tğŭĻ Ћ ƚŅ Ћ <br /> <br />