Laserfiche WebLink
#/.3)$%2 !002/6!, /2 /4(%2 !#4)/. 2%'!2$).' !54(/2)49 ).6/)#%3ǿ !.$ <br />!54(/2):% !$$).' "/!2$ -%-"%23 4/ .%7 "!.+ 3)'.!452% #!2$ !.$ 2%-/6).' <br />).$)6)$5!,3 &2/- 3)'.!452% #!2$ ./ ,/.'%2 /. "/!2$ȁ <br />included in the Board materials. Director Antone noted a typo for check number #0210 payable to <br />the City of La Porte in the bookkeeper report showing the check in the amount of $109,973.15. The <br />correct amount of check number 0210 is $108,973.15 and was verified by invoice and the written <br />check was in the correct amount. Mr. Hawes requested approval of adding Barry Beasley, Alton <br />Porter, Nicole Havard, Mark Goodwin, Rick Helton, David Janda, and Kristen Lee as authorized <br />signors for the bank checking account; and removing all other signors with the exception of Peggy <br />Antone and David Hawes. A letter to the bank was presented for signature outlining the adding and <br />removal of signors. Upon a motion made by Director Beasley, and seconded by Director Goodwin, <br />invoices, as presented; and (b) Authorized adding Barry Beasley, Alton Porter, Nicole Havard, Mark <br />Goodwin, Rick Helton, David Janda, and Kristen Lee as authorized signors for the bank checking <br />account; and removing all other signors with the exception of Peggy Antone and David Hawes. <br /> <br />2%#%)6% 50$!4% &2/- '!5'% %.').%%2).' 2%'!2$).' - 342%%4 )-02/6%-%.4 <br />PROJECT. <br />Mr. Ali reported Gauge Engineering had completed value engineering for the M Street improvement <br />project. He reported Gauge Engineering, Hawes Hill Staff, and City of La Porte staff met to discuss the <br />value engineering. He reported Gauge Engineering identified missing items from the construction <br />plans, design issues, bid item issues, etc. He reported a drainage impact analysis was not performed, <br />and Mr. Alexander verified the City requires a drainage study be performed for improvement projects <br />such as M Street. He also stated the City is recommending and authorized Gauge to conduct the <br />drainage impact analysis. Mr. Hawes stated the need for an October board meeting and at that time <br />a Task Order from Gauge Engineering will be presented for the drainage analysis and other items <br />needed to be conducted. No action from the Board was required. <br /> <br />2%#%)6% 50$!4%3 &2/- 4(% #)49Ǿ $%6%,/0%23Ǿ !.$ 34!&& !"/54 $%6%,/0-%.4 7)4(). <br />4(% :/.%ȁ <br />None. Everything was covered during the meeting. <br /> <br />"/!2$ -%-"%2 #/--%.43ȁ <br /> <br />a. - ³³¤±²  ¯¯¤ ±¨­¦ ®­  ¦¤­£ ǿ  ­£ <br />b. )­°´¨±¸ ®¥ ²³ ¥¥ ±¤¦ ±£¨­¦ ²¯¤¢¨¥¨¢ ¥ ¢³´ « ¨­¥®±¬ ³¨®­ ®± ¤·¨²³¨­¦ ¯®«¨¢¸ȁ <br />None. <br /> <br />ADJOURNMENT. <br />There being no further business to come before the Board, the meeting was adjourned at 7:02 p.m. <br /> <br /> <br /> <br /> ________________________________________________ <br /> Secretary <br /> <br />