Laserfiche WebLink
Port of Houston Authoritv <br />11/17/11— P & Z Meeting <br />Page 2 of 4 <br />Port of Houston Authority worked diligently with the City to address the <br />community concerns, e.g. noise & sound pollution, lighting/illumination, <br />and potential devaluation (appraised/market value) of adjacent residences. <br />The site development plan was developed in two phases. A 20' high sound <br />wall was constructed along the south property line to avoid adverse impact <br />on the adjacent residential properties. Phase 11 included all the site work, <br />parking lot, drives, utilities, and landscape improvement. <br />The Planning and Zoning Commission considered the Major Development <br />Site Plan for Entry Pre -Check Facility at their January 15, 2004, meeting. <br />The Commission approved the plan with the following consideration: <br />• Provisions of the approved SCUP and General Plan must be applied to <br />the entire project. <br />• A subdivision plat for the entire 20.7-acre tract shall be submitted for <br />approval by the City before filing with the Harris County. <br />The facility has been open since November 05, 2007 under the temporary <br />certificate of occupancy that the contractor obtained from the City of La <br />Porte. A pennanent certificate of occupancy can be issued when <br />landscaping/irrigation and platting issues are resolved. <br />The Port has requested to delete conditions 410 & 11 of the existing <br />Special Conditional Use Permit, pertaining to noise and hours of <br />operation. While the Port has indicated a desire to amend the existing <br />SCUP, they also indicated that the need to do so is more based upon <br />projected future activity. As a separate action, the Port will be requesting a <br />certificate of occupancy and approval of a subdivision plat by the City. <br />Analysis: Section 106-659 of the Code of Ordinances establishes the following criteria <br />for review of development projects within a PUD zoning district: <br />Land Use — The City's Comprehensive Plan shows this area developing <br />with industrial uses. The existing land uses of nearby properties are primarily <br />industrial (the Port Authority's main facility); however, there are single- <br />family residences south of the undeveloped "E" Street right-of-way. <br />Transportation — Being located along Barbour's Cut Boulevard, a primary <br />arterial road and major truck route, provides adequate accessibility for <br />circulation of truck traffic. Limited impact on traffic flow is expected within <br />the vicinity even after full implementation of the project. <br />The two private drives and truck parking areas are designed and constructed <br />in conformance with City Standards. In addition, the pre -check facility will <br />lessen the amount of time trucks spend idling on Barbour's Cut Blvd. This <br />results in fewer NOx being released in the air. <br />