My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
10-11-21
LaPorte
>
City Secretary
>
Agenda packets 2010 to current
>
10-11-21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2023 8:48:20 AM
Creation date
3/7/2025 1:33:48 PM
Metadata
Fields
Template:
City Meetings
Meeting Body
Drainage and Flooding Committee
Meeting Doc Type
Agenda Packet
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Lorenzo Wingate <br />City of La Porte <br />August 31, 2021 <br /> <br />Page 2 <br />The basic services are divided into the following tasks, based on actual time and materials (T&M), and <br />shall not exceed the anticipated level of effort and associated fees shown below. <br />Basic Services <br />1. Study Phase Services $ 78,096 (T&M) <br /> <br />2. Design Phase Services $ 195,597 (T&M) <br /> <br />3. Construction Phase Services $ 11,034 (T&M) <br />Total Basic Services:$ 284,727 <br /> <br />Halff has scoped the following additional services to be authorized at a later date on an as-needed basis. <br /> <br />Additional Services: <br /> CWA Nationwide Permit $ 10,440 (T&M) <br /> Cultural Resources Constraints Analysis $ 15,360 (T&M) <br /> Phase II ESA $ 23,640 (T&M) <br /> Subsurface Utility Engineering $ 4,820 (T&M) <br /> Construction Staking Services $ 2,955 (T&M) <br />Total Additional Services: $ 57,215 <br /> <br />Total Basic & Additional Services: $ 341,942 <br /> <br />Line items are intended to be authorized and released contingent on available funding. <br />We appreciate the opportunity to be of service to fulfill the terms of the Interlocal Agreement established <br />between the City of La Porte and the City of Pasadena. Please feel free to contact me if you have any <br />questions or comments concerning this proposal. <br /> <br />Sincerely, <br />Halff Associates, Inc. Approved by: <br /> <br /> <br /> ______________________________ <br />Long Nguyen, P.E. Corby D. Alexander <br />Public Works Team Leader City Manager, City of La Porte <br /> <br />Attachments: <br />Attachment ÐAÑ: Detailed scope of services Approved by: <br />Attachment ÐBÑ: Detailed level of effort <br />Attachment ÐCÑ: Vicinity map <br />Attachment ÐDÑ: Project schedule ______________________________ <br />Attachment ÐEÑ: Topographic survey proposal Robin S. Green, Jr., PE <br />Attachment ÐFÑ: Geotechnical services proposal Director of Public Works, City of Pasadena <br /> <br />Cc. File <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.