My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
10-18-12 Regular, Public Hearing and Workshop Meeting of the Planning and Zoning Commission
LaPorte
>
City Secretary
>
Agenda packets 2010 to current
>
Planning/Inspections
>
Planning and Zoning Commission
>
2012
>
10-18-12 Regular, Public Hearing and Workshop Meeting of the Planning and Zoning Commission
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/16/2012 12:45:11 PM
Creation date
3/7/2025 1:35:25 PM
Metadata
Fields
Template:
La Porte TX
Document Type
Agenda PACKETS
Date
10/18/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Planning and Zoning Commission <br />Minutes of September 20, 2012 <br />Page 3 of 4 <br /> <br /> <br />Change the Future Land Use Plan for the area that includes the d <br />th <br />St. and SH 146 S, within the Port Crossing Business Park, from Parks and Op <br />S. 16 <br />Space to Business Industrial. <br /> <br />Leave the first four (4) lots off Fairmont Parkway (two blocks e <br />Commercial and change the remainder of lots in the block, up to W. I St., to Low <br />Density Residential on the Future Land Use Plan. <br /> <br />Change the tract east of Taylor Bayou along S. Broadway from Res <br />Commercial on the Future Land Use Plan. <br /> <br />Retain the existing tract at the northeast corner of Wharton WeeSH 146 as <br />Commercial on the Future Land Use Plan. <br /> <br />Correct any typos and incorrect references throughout the docume <br /> <br />Second by Commissioner Warren. Motion carried. <br /> <br />Ayes: Commissioners Warren, LaCour, Follis, Earp, Bird, and Chairman L <br />Nays: Commissioner Hoot <br /> <br />Chairman Lawler thanked Kendig Keast Collaborative for their pro <br /> <br />Administrative Reports <br />7. <br /> <br />Tim Tietjens, Planning Director, reported City Council has directed a planning/procedural audit <br />of the Planning Department to ensure the City is being as responsive to our citizens as possible. <br />As part of the audit, Commission Members will more than likely be interviewed by the <br />consultant. It is anticipated the entire process should take approximately six (6) months. <br /> <br />Commission Comments on matters appearing on agenda or inquiry of <br />8. <br />factual information or existing policy. <br />Chairman Lawler thanked City staff for their contribution in working with the Commission to <br />review and update the Comprehensive Plan. <br /> <br />Commissioner Warren spoke of his appreciation for everyone working together and the <br />dedicated to completing the Plan update. <br /> <br />Commissioner LaCour thanked the group. <br /> <br />Commissioner Follis stated he was proud of the final draft Plan and inquired ab <br />be next for the Commission to review. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.